TIC 4.0

FirstTimeCarrierReadyToWork

CONCEPT

Fields

Type

Description

Purpose

Fields

Type

Description

Purpose

ID (Concept identifier)

M

firsttimecarrierreadytowork

GRAMMAR

Concept name

M

FirstTimeCarrierReadyToWork

GRAMMAR

Concept type

M

Event

GRAMMAR

Also known as

O

Ready for cargo operations, ready to work, commencing operation

TIC Description

Definition

M

Event when a carrier (vessel, barge, rail, truck) reports First time readiness for cargo operations as reported by the carrier to the terminal according to local regulations

TIC Description

Further Detail

O

FirstTimeCarrierReadyToWork is a sub-concept of the subject (process) CarrierVisit.

Vessel:

Event when the vessel reports First time readiness for cargo operations as reported by the vessel to the terminal according to local regulations

Truck:

Event when the truck is First Time ready to be unloaded/loaded with cargo, i.e. when the truck is in the transfer area and confirms that it can be loaded/unloaded.

Rail:

Event when the train is First Time ready to be loaded or unloaded. This is determined either manually (output) (e.g. “walk the train” to achieve readiness for cargo operations).

TIC Description

Required Information

M

SUBJECT and VALUE

TIC Description

SUBJECT

 

CarrierVisit

 

POINT OF MEASUREMENT

 

#input;#internal_in ; #internal_out ;#output

#planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status; #duration; #timer; #totaltimer; #startevent; #startcounter; #endevent; #endcounter

 

Value

 

TRUE; FALSE;

 

Related standards

O

  JIT Port call Data definitions 1.2 (June 2022)

TIC Description

Related TIC 4.0 definition

O

CarrierVisit Carrier Arrival TerminalOperations Departure

TIC Description

Example

M

tos.@.carriervisit.@.firsttimecarrierreadytowork.output.actual.time: = The carrier is ready to be operated or for any other cargo operations to be carried out.

TIC Description

Example in the context of the grammar

M

 

TIC Description

Link to one or more operational processes

M

 

TIC Description

Search tags

M

 

Technical

Version / Date

M

2022.006 - 1/12/2022

Technical

Internal TIC Version

M

20230313

Technical

M = Mandatory

O = Optional

 


 

Created by

Edited by

Review / Approve

Published

 @RBS EMEA 2022-10-20

 @Francisco Blanquer Jaraiz

20221121 

 

 

 

 

 

 

© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport