TIC 4.0
TerminalBerthReadyForDeparture
CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | terminalberthreadyfordeparture | GRAMMAR |
Concept name | M | TerminalBerthReadyForDeparture | GRAMMAR |
Concept type | M | status | GRAMMAR |
Also known as | O | Vessel free to depart, Terminal ready for starting the departure, Terminal ready for departure | TIC Description |
Definition | M | Terminal Status indicates that there is no restriction from the terminal to the carrier to leave the terminal. All non carrier workers are off “carrier” (of board) or in a safety position and there is no interference with any CHE. | TIC Description |
Further Detail | O | TerminalBerthReadyForDeparture is a sub-concept of the subject (process) CarrierVisit. Vessel: Status when the terminal has the quay cranes in the correct position for the ship to sail and terminal is ready for the safe departure of the vessel. In addition, the terminal is ready to unberth vessel in a safe manner and there are no obstacles remaining at the quay Truck: Status when transferzone is free to park (mooring) (there is no other truck or trailer that may interfere), CHE interference is clear (ASC, SC). Rail: The rail status is free to run (mooring) (there is not another train or obstacle that may obstruct), CHE interference is clear (RTG, RMG, RS, etc). | TIC Description |
Required Information | M | SUBJECT and VALUE | TIC Description |
SUBJECT |
| #carriervisit |
|
POINT OF MEASUREMENT |
| #input;#iinput; #ioutput;#output #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #status; #duration; #timer; #totaltimer; |
|
Value |
| TRUE; FALSE; |
|
Related standards | O | JIT Port call Data definitions 1.2 (June 2022) | TIC Description |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | tos.@.carriervisit.@.terminalberthreadyfordeparture.output.actual.status: TRUE = terminal allows the carrier to leave. | TIC Description |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M |
| TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 2022.006 - 1/12/2022 | Technical |
Internal TIC Version | M | 20230313 | Technical |
M = Mandatory
O = Optional
Created by | Edited by | Review / Approve | Published |
@RBS EMEA 2022-10-20 | @Francisco Blanquer Jaraiz 20221121 |
|
|
|
|
|
|
© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport