TIC 4.0
FirstTimeTerminalReadyToWork
CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | firsttimeterminalreadytowork | GRAMMAR |
Concept name | M | FirstTimeTerminalReadyToWork | GRAMMAR |
Concept type | M | Event | GRAMMAR |
Also known as | O | First time labour on board; terminal ready to work; Gang ready | TIC Description |
Definition | M | Event when the terminal resources (equipment and workers) are first time ready to start the lashing or cargo operations on a specific CarrierVisit (vessel, barge, rail, truck etc visit) . | TIC Description |
Further Detail | O | FirstTimeTerminalReadyToWork is a sub-concept of the subject (process) CarrierVisit. Vessel: Event when the terminal reports the first time labour is on board for lashing or in case lashing is not needed to start operations then at least one CHE (STS, MC) is ready to initiate the first container move of the specific carrier visit. Truck: Event when the terminal reports the first time CHE with its driver (if manually operated) is available at the established location (transferzone) and ready to work for the specific truck visit. Rail: Event when the terminal reports the first time CHE with its driver driver (if manually operated) is available at the established location (rail area) and ready to work for the specific train visit. | TIC Description |
Required Information | M | SUBJECT and VALUE | TIC Description |
SUBJECT |
| #carriervisit |
|
POINT OF MEASUREMENT |
| #input;#iinput; #ioutput;#output #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #time; #logical; #coordinate |
|
Value |
| time: ISO8601 coordinate: WGS84 |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | tos.@.carriervisit.@.firsttimeterminalreadytowork.output.actual.time: = | TIC Description |
Example in the context of the grammar | M |
| TIC Description |
Link to one or more operational processes | M |
| TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 2022.006 - 1/12/2022 | Technical |
Internal TIC Version | M | 20230313 | Technical |
M = Mandatory
O = Optional
Created by | Edited by | Review / Approve | Published |
@RBS EMEA 2022-10-20 | @Francisco Blanquer Jaraiz 20221121 |
|
|
|
|
|
|
© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport