TIC 4.0
TerminalReadyToWork
CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | terminalreadytowork | GRAMMAR |
Concept name | M | TerminalReadyToWork | GRAMMAR |
Concept type | M | Status | GRAMMAR |
Also known as | O |
| TIC Description |
Definition | M | Terminal Status indicates that the resources (equipment and workers) are ready to lash or execute cargo operations on a specific CarrierVisit (vessel, barge, rail, truck etc visit) . | TIC Description |
Further Detail | O | TerminalReadyToWork is a sub-concept of the subject (process) CarrierVisit. Vessel: Status when the terminal has the labour ready to go on board or is actually doing lashing or at least one CHE is ready to start operations or actually is moving cargo. Truck: Status when the terminal has the CHE with its driver (if manually operated) available at the established location (transferzone) and ready to work or working for the specific truck visit. Rail: Status when the terminal has the CHE with its driver (if manually operated) available at the established location (rail area) and ready to work or working for the specific train visit. | TIC Description |
Required Information | M | SUBJECT and VALUE | TIC Description |
SUBJECT |
| #carriervisit |
|
POINT OF MEASUREMENT |
| #input;#iinput; #ioutput;#output #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #time; #logical; #coordinate |
|
Value |
| time: ISO8601 coordinate: WGS84 |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | tos.@.carriervisit.@.terminalreadytowork.output.actual.status: TRUE The terminal is ready to start Operations for the specific carriervisit or actually is in the lashing or cargooperations process. | TIC Description |
Example in the context of the grammar | M |
| TIC Description |
Link to one or more operational processes | M |
| TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 2022.006 - 1/12/2022 | Technical |
Internal TIC Version | M | 20230313 | Technical |
M = Mandatory
O = Optional
Created by | Edited by | Review / Approve | Published |
@RBS EMEA 2022-10-20 | @Francisco Blanquer Jaraiz 20221121 |
|
|
|
|
|
|
© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport