TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 7 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

firsttimecarrierreadyfordeparture

GRAMMAR

Concept name

M

FirstTimeCarrierReadyForDepature

GRAMMAR

Concept type

M

Event

GRAMMAR

Also known as

O

Ready for Carrier Travel, Finished Cargo Operation and 3rd Party Services in the Terminal

TIC Description

Definition

M

Event when a carrier (vessel, barge, rail, truck) reports First time readiness for carrier departure (vessel ready for sailing, truck ready to gate out of the Terminal, Rail ready to move)

TIC Description

Further Detail

O

FirstTimeCarrierReadyForDeparture is a sub-concept of the subject (process) CarrierVisit.

Vessel:

Event when the vessel reports First time readiness for sailing as reported by the vessel to the terminal and the marine services provider according to local regulations

Truck:

Event when the truck is First Time ready to be gate out of the terminal, whether loaded with containers or with no containers on its trailer, i.e. when the truck is in the Terminal area and is queued in the gate out lane.

Rail:

Event when the train is First Time ready to move out of the Terminal or Port.

TIC Description

Required Information

M

SUBJECT and VALUE

TIC Description

SUBJECT

 

CarrierVisit

 

POINT OF MEASUREMENT

 

#input;#internal_in ; #internal_out ;#output

#planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status #time; #logical; #coordinate

 

Value

 

TRUE; FALSE
time: ISO8601
coordinate: WGS84

 

Related standards

O

TIC Description

Related TIC 4.0 definition

O

CarrierVisit Carrier Arrival TerminalOperations Departure

TIC Description

Example

M

tos.@.carriervisit.@. firsttimecarrierreadyfordeparture.output.actual.time: = The carrier is ready to depart or travel.

TIC Description

Example in the context of the grammar

M

 

TIC Description

Link to one or more operational processes

M

 

TIC Description

Search tags

M

 

Technical

Version / Date

M

2023.008 - 20/06/2023

Technical

Internal TIC Version

M

20221121

Technical

M = Mandatory

O = Optional

 


 

Created by

Edited by

Review / Approve

Published

 Basma Khattab 2023-03-13 (draft)

 

 

 

 

 

 

 

  • Sin etiquetas