TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 10 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

firsttimeterminalberthreadforyarrival

GRAMMAR

Concept name

M

FirstTimeTerminalBerthReadyForArrival

GRAMMAR

Concept type

M

Event

GRAMMAR

Also known as

O

Berth Free, Truck Allowed, Rail Free, Slot free, Allowed to get in.

TIC Description

Definition

M

Event when the terminal berth or transferzone is first time ready to receive a specific CarrierVisit (vessel, barge, rail, truck) TerminalBerthReadyForArrival is first time true for an specific carrier visit.

TIC Description

Further Detail

O

FirstTimeTerminalBerthReadyForArrival is a sub-concept of the subject (process) CarrierVisit

Vessel:

Event when the terminal reports FirstTimeTerminalBerthReadyForArrival for the specific vessel visit, berth is free for mooring (there is no other vessel or barge that may interfere); STS interference is clear.

Truck:

Event when the terminal reports FirstTimeTerminalBerthReadyForArrival for the specific truck visit, the transferzone is free to park (mooring) (there is no other truck or trailer that may interfere), CHE interference is clear (ASC, SC).

Rail:

Event when the terminal reports FirstTimeTerminalBerthReadyForArrival for the specific train visit, the rail is free to stop (mooring) (there is no other train or obstacule that may interfere), CHE interference is clear (RTG, RMG, RS, etc).

TIC Description

Required Information

M

SUBJECT and VALUE

TIC Description

SUBJECT

 

#carriervisit

 

POINT OF MEASUREMENT

 

#input;#iinput; #ioutput;#output

#planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#time; #logical; #coordinate

 

Value

 

time: ISO8601

coordinate: WGS84

 

Related standards

O

  

TIC Description

Related TIC 4.0 definition

O

CarrierVisit Carrier Arrival TerminalOperations Departure

TIC Description

Example

M

tos.@.carriervisit.@.firsttimeterminalberthreadforyarrival.output.actual.time: =2022-04-26T10:00:00.000Z = The terminal is ready to start Operations for the specific carriervisit first time.

TIC Description

Example in the context of the grammar

M

 

TIC Description

Link to one or more operational processes

M

 

TIC Description

Search tags

M

 

Technical

Version / Date

M

2022.006 - 1/12/2022

Technical

Internal TIC Version

M

20221121

Technical

M = Mandatory

O = Optional

 


 

Created by

Edited by

Review / Approve

Published

 RBS EMEA 2022-10-20

 Francisco Blanquer Jaraiz

20221121 

 

 

 

 

 

 

  • Sin etiquetas