CONCEPT
Fields | Type | Description | Purpose |
ID (Concept identifier) | M | firsttimecarrierreadyfordeparture | GRAMMAR |
Concept name | M | FirstTimeCarrierReadyForDeparture | GRAMMAR |
Concept type | M | Event | GRAMMAR |
Also known as | O | Ready for Carrier Travel, Ready to Sail, Ready to Drive, Ready to Go, All Duties Done, Finished Cargo Operation and 3rd Party Services in the Terminal | TIC Description |
Definition | M | Event when a carrier (vessel, barge, rail, truck) reports First time readiness for carrier departure (vessel ready for sailing, truck ready to exit at gate out of the Terminal and ready to initiate the Gate Out process, train ready to depart). | TIC Description |
Further Detail | O | FirstTimeCarrierReadyForDeparture is a sub-concept type process of the Subject CarrierVisit. Carrier is ready for departure when all of its own activities are complete and only depends on activities related to the departure process.From the Carrier’s side, the Carrier has nothing else to do and has to wait for other activities. There is no activity that they have to do themselves for departure. Vessel: Event when the vessel reports First time readiness to sail to from the terminal and is waiting for the marine services provider according to local regulations, (regardless if gangway is up or down because the gangway belongs to the departure process). All the vessel-related activities and prerequisites for sailing are done, e.g.:
Then, Vessel sailing is waiting for activities related to departure:
Truck: Event when the truck is First Time ready to exit at gate out of the Terminal ready to initiate the Gate Out (Departure) process, whether loaded with containers or with no containers on its trailer, i.e. when the truck is in the Terminal area and is queued in the Gate Out lane or at the Gate Pedestal. All the truck-related activities and prerequisites for gate out are done, e.g.:
Then, Truck is waiting for an external (for the Truck) interlock to be released, or start the gate out process (departure process). Potential external limitationsinterlocks:
Rail: Event when the train is First Time ready to move out or depart from the Terminal/Port.
Then, the Train can start the departure process and is waiting for external limitations(for the Train) interlocks to be released:
| TIC Description |
Required Information | M | SUBJECT and VALUE | TIC Description |
SUBJECT |
| CarrierVisit |
|
POINT OF MEASUREMENT |
| #input;#internal_in ; #internal_out ;#output #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #status #time; #logical; #coordinate |
|
Value |
| TRUE; FALSE |
|
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | tos.@.carriervisit.@.firsttimecarrierreadyfordeparture.output.actual.time = The carrier is ready to depart or travel. | TIC Description |
Example in the context of the grammar | M |
| TIC Description |
Link to one or more operational processes | M |
| TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 2023.008 - 20/06/2023 | Technical |
Internal TIC Version | M | 2023051720230609 | Technical |
M = Mandatory
O = Optional
...
Created by | Edited by | Review / Approve | Published |
Basma Khattab 2023-03-13 (draft) | RBS EMEA 2023-06.07 | Francisco Blanquer Jaraiz 2023-06-09 |
|
|
|
|
|