Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

Sugerencia

INFO MODEL - With the defined processes, following events are considered for this publication - these are aligned as much as possible with mentioned references by IMO and DCSA, but include some specific ones for Terminal Operators and Ports for TIC 4.0.

...

#

TIC 4.0

Event Timestamp

Phase

Owner

Description

DCSA → TIC 4.0

TIC 4.0->DCSA

Arrival

carriervisit.arrival.start

End of Sea passage

Arrival

Carrier

when a carrier enters inside the boundary of the Port activity. Usually this boundary is a physical border (port gate, barrier or geo zone) but may also be located outside a physical border (e.g., a pregate control point).

DCSA End of Sea passage = carriervisit.arrival.start

carriervisit.arrival.start.schedule = XXX

carriervisit.arrival.start.proposal = XXX

carriervisit.arrival.start.request = XXX

carriervisit.arrival.start.planning = XXX

carriervisit.arrival.start.estimated = XXX

carriervisit.arrival.start.actual = EOSP

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407248

carriervisit.arrival.drift.start

The date/time vessel starts drifting operation

Drift

Carrier

TO BE COMPLETED
(e.g. on “STOP Engine” after reaching drifting position)

no DCSA timestamp available

carriervisit.arrival.drift.start.schedule = XXX

carriervisit.arrival.drift.start.proposal = XXX

carriervisit.arrival.drift.start.request = XXX

carriervisit.arrival.drift.start.planning = XXX

carriervisit.arrival.drift.start.estimated = XXX

ccarriervisit.arrival.drift.start.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407248

carriervisit.arrival.drift.end

The date/ time vessel completes drifting operation

Drift

Carrier

TO BE COMPLETED
(e.g. on “START Engine” after reaching drifting position)

no DCSA timestamp available

carriervisit.arrival.drift.end.schedule = XXX

carriervisit.arrival.drift.end.proposal = XXX

carriervisit.arrival.drift.end.request = XXX

carriervisit.arrival.drift.end.planning = XXX

carriervisit.arrival.drift.end.estimated = XXX

ccarriervisit.arrival.drift.end.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000243208

carriervisit.arrival.anchorage.start

The date/time vessel starts anchorage operation

Anchorage

Carrier

Let go (arrival) the anchor

DCSA #97 Actual Time of Start Anchorage Operation (ATS Anchorage Ops) = carriervisit.arrival.anchorage.start.actual

carriervisit.arrival.anchorage.start.schedule = XXX

carriervisit.arrival.anchorage.start.proposal = XXX

carriervisit.arrival.anchorage.start.request = XXX

carriervisit.arrival.anchorage.start.planning = XXX

carriervisit.arrival.anchorage.start.estimated = XXX

carriervisit.arrival.anchorage.start.actual = ATSAO

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000243208

carriervisit.arrival.anchorage.end

The date/ time vessel completes anchorage operation

Anchorage

Carrier

Anchor heaved in and nested (departure)

carriervisit.arrival.anchorage.end.actual =
DCSA #98 Actual Time of Completion Anchorage Operation (ATC Anchorage Ops)

carriervisit.arrival.anchorage.end.schedule = XXX

carriervisit.arrival.anchorage.end.proposal = XXX

carriervisit.arrival.anchorage.end.request = XXX

carriervisit.arrival.anchorage.end.planning = XXX

carriervisit.arrival.anchorage.end.estimated = XXX

carriervisit.arrival.anchorage.end.actual = ATCAO

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.arrival.pilot.vesselatpilotboardingplace

First date/time the vessel is at pilot boarding place.

Pilot

Port, Pilot

First date/time the vessel is at pilot boarding place.

carriervisit.arrival.vesselatpilotboardingplace.proposal = ETA PBP

carriervisit.arrivalvesselatpilotboardingplace.schedule = XXX

carriervisit.arrival.vesselatpilotboardingplace.proposal = ETA PBP

carriervisit.arrival.vesselatpilotboardingplace.request = XXX

carriervisit.arrival.vesselatpilotboardingplace.planning = XXX

carriervisit.arrival.vesselatpilotboardingplace.estimated = XXX

carriervisit.arrival.vesselatpilotboardingplace.actual = ATA PBP

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.arrival.pilotage.firstimepilotonboard

The date/time a pilotage service provider starts attendance to the vessel

Pilot

Port, Pilot

When the pilot boards the vessel upon arrival at the pilot boarding place

DSCA #36 Actual Time Start Pilotage (ATS Pilotage) = carriervisit.arrival.pilot.start.actual

carriervisit.arrival.pilotage.firstimepilotonboard.schedule = XXX

carriervisit.arrival.pilotage.firstimepilotonboard.proposal = XXX

carriervisit.arrival.pilotage.firstimepilotonboard.request = XXX

carriervisit.arrival.pilotage.firstimepilotonboard.planning = XXX

carriervisit.arrival.pilotage.firstimepilotonboard.estimated = XXX

carriervisit.arrival.pilotage.firstimepilotonboard.actual = ATS Pilotage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.arrival.pilotage.lasttimepilotonboard

The date/time a pilotage service on the vessel is completed

Pilot

Port, Pilot

When the pilot disembarks the vessel (on arrival at berth)

DSCA #40 Actual Time of Completion Pilotage (ATC Pilotage) =

carriervisit.arrival.pilot.end.actual

carriervisit.arrival.pilotage.lasttimepilotonboard.schedule = XXX

carriervisit.arrival.pilotage.lasttimepilotonboard.proposal = XXX

carriervisit.arrival.pilotage.lasttimepilotonboard.request = XXX

carriervisit.arrival.pilotage.lasttimepilotonboard.planning = XXX

carriervisit.arrival.pilotage.lasttimepilotonboard.estimated = XXX

carriervisit.arrival.pilotage.lasttimepilotonboard.actual = ATC Pilotage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407662

carriervisit.arrival.towage.start

The date/time a towage service provider starts attendance to the vessel

Towage

Towage service provider

First Tug connected or standing by the vessel

DCSA #37 Actual Time Start Towage (ATS Towage) = carriervisit.arrival.towage.start.actual

carriervisit.arrival.towage.start.schedule = XXX

carriervisit.arrival.towage.start.proposal = XXX

carriervisit.arrival.towage.start.request = XXX

carriervisit.arrival.towage.start.planning = XXX

carriervisit.arrival.towage.start.estimated = XXX

carriervisit.arrival.towage.start.actual = ATS Towage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407662

carriervisit.arrival.towage.end

The date/time when the last tug has been released from the vessel

Towage

Towage service provider

Last Tug disconnected or released by the vessel

DCSA #38 Actual Time Completion Towage (ATC Towage) = carriervisit.arrival.towage.end.actual

carriervisit.arrival.towage.end.schedule = XXX

carriervisit.arrival.towage.end.proposal = XXX

carriervisit.arrival.towage.end.request = XXX

carriervisit.arrival.towage.end.planning = XXX

carriervisit.arrival.towage.end.estimated = XXX

carriervisit.arrival.towage.end.actual = ATC Towage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.arrival.mooring.start

The date/ time a service provider starts mooring of the vessel

Arrival
Mooring

Mooring service provider

carriervisit.arrival.mooring.start.schedule = XXX

carriervisit.arrival.mooring.start.proposal = XXX

carriervisit.arrival.mooring.start.request = XXX

carriervisit.arrival.mooring.start.planning = XXX

carriervisit.arrival.mooring.start.estimated = XXX

carriervisit.arrival.mooring.start.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.arrival.mooring.firstline

The date/ time a service provider starts mooring of the vessel

Arrival
Mooring

Mooring service provider

When the first slungshot landed/first line received by mooring boat (arrival)

DCSA #39 Actual Time of Start Mooring (ATS Mooring) = carriervisit.arrival.mooring.firstline.actual

carriervisit.arrival.mooring.start.schedule = XXX

carriervisit.arrival.mooring.start.proposal = XXX

carriervisit.arrival.mooring.start.request = XXX

carriervisit.arrival.mooring.start.planning = XXX

carriervisit.arrival.mooring.start.estimated = XXX

carriervisit.arrival.mooring.start.actual = ATS Mooring

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.arrival.mooring.firstline

The date/ time a service provider starts mooring of the vessel

Arrival
Mooring

Mooring service provider

carriervisit.arrival.mooring.firstline.schedule = XXX

carriervisit.arrival.mooring.firstline.proposal = ETA Berth

carriervisit.arrival.mooring.firstline.request = RTA Berth

carriervisit.arrival.mooring.firstline.planning = PTA Berth

carriervisit.arrival.mooring.firstline.estimated = XXX

carriervisit.arrival.mooring.firstline.actual = ATA Berth

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.arrival.mooring.lastline

Actual time the last line on bollard, mooring is completed, and the vessel is completely tied to the dock

Arrival
Mooring

Mooring service provider

Last line and the vessel are tied to the dock

DCSA #42 Actual Time All Fast (AT All fast) = carriervisit.arrival.mooring.end.actual

carriervisit.arrival.mooring.end.schedule = XXX

carriervisit.arrival.mooring.end.proposal = XXX

carriervisit.arrival.mooring.end.request = XXX

carriervisit.arrival.mooring.end.planning = XXX

carriervisit.arrival.mooring.end.estimated = XXX

carriervisit.arrival.mooring.end.actual = AT All Fast

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.arrival.mooring.end

The date/time a mooring service provider confirms to attend to the vessel: whenever ETC is communicated by linemen.

Arrival
Mooring

Mooring service provider

DCSA #44 Actual Time of Completion Mooring (ATC Mooring)

carriervisit.arrival.mooring.end.schedule = XXX

carriervisit.arrival.mooring.end.proposal = XXX

carriervisit.arrival.mooring.end.request = XXX

carriervisit.arrival.mooring.end.planning = XXX

carriervisit.arrival.mooring.end.estimated = XXX

carriervisit.arrival.mooring.end.actual = ATC Mooring

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000243829

carriervisit.firsttimecarriersafetyaccesible

Actual time gangway is resting on the quay with the safety net fully rigged

Arrival

Carrier

Gangway down and safety net available for access enabled to vessel: whenever safe access to vessel is communicated by vessel.

DCSA #43 Gangway Down and Safe = carriervisit.arrival.carriersafetyaccessible.actual

carriervisit.firsttimecarriersafetyaccesible.schedule = XXX

carriervisit.firsttimecarriersafetyaccesible.proposal = XXX

carriervisit.firsttimecarriersafetyaccesible.request = XXX

carriervisit.firsttimecarriersafetyaccesible.planning = XXX

carriervisit.firsttimecarriersafetyaccesible.estimated = XXX

carriervisit.firsttimecarriersafetyaccesible.actual = Gangway Down and Safe

FirstTimeCarrierReadyToWork

Arrival

carriervisit.firsttimecarrierreadytowork

carriervisit.arrival.end

First time readiness for cargo operations as reported by the vessel to the terminal according to local regulations

Arrival

Carrier

Readiness for cargo operations as reported by the vessel to the vessel according to local regulations: whenever vessel readiness for cargo ops is communicated by vessel.

DCSA #45 Vessel Readiness for Cargo operations = carriervisit.firsttimecarrierreadytowork.actual

carriervisit.firsttimeterminalreadytowork.schedule = XXX

carriervisit.firsttimeterminalreadytowork.proposal = XXX

carriervisit.firsttimeterminalreadytowork.request = XXX

carriervisit.firsttimeterminalreadytowork.planning = XXX

carriervisit.firsttimeterminalreadytowork.estimated = XXX

carriervisit.firsttimeterminalreadytowork.actual = Vessel Readiness for Cargo operations

carriervisit.arrival.end.schedule = XXX

carriervisit.arrival.end.proposal = XXX

carriervisit.arrival.end.request = XXX

carriervisit.arrival.end.planning = XXX

carriervisit.arrival.end.estimated = XXX

carriervisit.arrival.end.actual = XXX

https://tic40.atlassian.net/l/cp/hzxpNvCN

carriervisit.terminaloperations.lashing.start

Start of lashing,

Cargo OPS

Terminal

carriervisit.terminaloperations.lashing.start.schedule = XXX

carriervisit.terminaloperations.lashing.start.proposal = XXX

carriervisit.terminaloperations.lashing.start.request = XXX

carriervisit.terminaloperations.lashing.start.planning = XXX

carriervisit.terminaloperations.lashing.start.actual = XXX

https://tic40.atlassian.net/l/cp/i8P78cod

carriervisit.terminaloperations.cargooperations.start

Start of Cargo OPS, first container lift

Cargo OPS

Terminal

The date/time a terminal operator estimates cargo operations will start/fist commercial lift: whenever ETS is communicated.

carriervisit.terminaloperations.cargooperations.start.schedule = XXX

carriervisit.terminaloperations.cargooperations.start.proposal = ETS Cargo OPS

carriervisit.terminaloperations.cargooperations.start.request = RTS Cargo OPS

carriervisit.terminaloperations.cargooperations.start.planning = PTS Cargo OPS

carriervisit.terminaloperations.cargooperations.start.actual = ATS Cargo OPS

https://tic40.atlassian.net/l/cp/i8P78cod

carriervisit.terminaloperations.cargooperations.end

End of Cargo OPS, last container lift

Cargo OPS

Terminal

The date/time a terminal operator estimates cargo operations will be completed/last commercial lift: whenever ETC is communicated.

carriervisit.terminaloperations.cargooperations.end.schedule = XXX

carriervisit.terminaloperations.cargooperations.end.proposal = ETC Cargo OPS

carriervisit.terminaloperations.cargooperations.end.request = RTC Cargo OPS

carriervisit.terminaloperations.cargooperations.end.planning = PTC Cargo OPS

carriervisit.terminaloperations.cargooperations.end.actual = ATC Cargo OPS

https://tic40.atlassian.net/l/cp/hzxpNvCN

carriervisit.terminaloperations.lashing.end

End of lashing,

Cargo OPS

Terminal

carriervisit.terminaloperations.lashing.end.schedule = XXX

carriervisit.terminaloperations.lashing.end.proposal = XXX

carriervisit.terminaloperations.lashing.end.request = XXX

carriervisit.terminaloperations.lashing.end.planning = XXX

carriervisit.terminaloperations.lashing.end.actual = XXX

Departure

carriervisit.firsttimecarrierreadyfordeparture

Vessel Ready to Sail

Cargo OPS

Carrier

Vessel readiness for safe departure as reported by the vessel

carriervisit.carriervisit.firsttimecarrierreadyfordeparture.schedule = XXX

carriervisit.carriervisit.firsttimecarrierreadyfordeparture.proposal = XXX

carriervisit.carriervisit.firsttimecarrierreadyfordeparture.request = XXX

carriervisit.carriervisit.firsttimecarrierreadyfordeparture.planning = XXX

carriervisit.carriervisit.firsttimecarrierreadyfordeparture.actual = Vessel Ready to Sail

TerminalBerthReadyForDeparture

carriervisit.firsttimeterminalberthreadyfordeparture

Terminal ready for Vessel departure

Departure

Terminal

After cargo operations terminal declares carry is free for departure. In case of vessel, cranes interference out of berth and resources out vessel.

carriervisit.carriervisit.firsttimeterminalberthreadyfordeparture.schedule = XXX

carriervisit.carriervisit.firsttimeterminalberthreadyfordeparture.proposal = XXX

carriervisit.carriervisit.firsttimeterminalberthreadyfordeparture.request = XXX

carriervisit.carriervisit.firsttimeterminalberthreadyfordeparture.planning = XXX

carriervisit.carriervisit.firsttimeterminalberthreadyfordeparture.actual = Terminal ready for Vessel Departure

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.departure.pilot.start

The date/time a pilotage service provider starts attendance to the vessel

Pilot

Port, Pilot

The date/time a pilotage service provider confirms to attend the vessel: whenever PTS is communicated.

carriervisit.departure.pilotage.start.schedule = XXX

carriervisit.departure.pilotage.start.proposal = XXX

carriervisit.departure.pilotage.start.request = XXX

carriervisit.departure.pilotage.start.planning = XXX

carriervisit.departure.pilotage.start.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.departure.pilotage.firstimepilotonboard

Planned Start Pilotage service Departure

Pilot

Port, Pilotage

When the pilot boards the vessel before departure berth

DSCA #36 Actual Time Start Pilotage (ATS Pilotage) = carriervisit.departure.pilotage.firstimepilotonboard.actual

carriervisit.departure.pilotage.firstimepilotonboard.schedule = XXX

carriervisit.departure.pilotage.firstimepilotonboard.proposal = XXX

carriervisit.departure.pilotage.firstimepilotonboard.request = XXX

carriervisit.departure.pilotage.firstimepilotonboard.planning = XXX

carriervisit.departure.pilotage.firstimepilotonboard.actual = ATS Pilotage

Mooring

Departure

carriervisit.departure.mooring.firstline

carriervisit.departure.start

Start Mooring service Departure (first line)

Time of Departure, Berth

Departure

Port, Linemen

The date/time a mooring service provider confirms to attend the vessel: whenever PTS is communicated (first line)

The date/time when a vessel estimates it will depart from berth: whenever ETD is communicated.

carriervisit.departure.mooring.firstline.schedule = XXX

carriervisit.departure.mooring.firstline.proposal = ETD Berth

carriervisit.departure.mooring.firstline.request = RTD Berth

carriervisit.departure.mooring.firstline.planning = PTD Berth

carriervisit.departure.mooring.firstline.actual = ATD

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.departure.mooring.lastline

End Mooring service Departure (last line)

Departure

Port, Linemen

The date/time a mooring service provider confirms to finalize the mooring: whenever ETC is communicated and matching with ‘Last Line’ (OFF) event.

DCSA #42 Actual Time All Fast (AT All fast) = carriervisit.departure.mooring.lastline.actual

carriervisit.departure.mooring.lastline.schedule = XXX

carriervisit.departure.mooring.lastline.proposal = XXX

carriervisit.departure.mooring.lastline.request = XXX

carriervisit.departure.mooring.lastline.planning = XXX

carriervisit.departure.mooring.lastline.actual = AT All fast

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407869

carriervisit.departure.mooring.end

Actual time the last line on bollard, mooring is completed, and the vessel is completely fastened to the dock

departure
Mooring

Mooring service provider

When the last line is released (departure)

DCSA #44 Actual Time of Completion Mooring (ATC Mooring)

carriervisit.departure.mooring.lastline.schedule = XXX

carriervisit.departure.mooring.lastline.proposal = XXX

carriervisit.departure.mooring.lastline.request = XXX

carriervisit.departure.mooring.lastline.planning = XXX

carriervisit.departure.mooring.lastline.actual = ATC Mooring

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407662

carriervisit.departure.towage.start

The date/time a towage service provider starts attendance to the vessel

Towage

Towage service provider

First Tug connected or standing by the vessel

DCSA #37 Actual Time Start Towage (ATS Towage) = carriervisit.departure.towage.start.actual

carriervisit.departure.towage.start.schedule = XXX

carriervisit.departure.towage.start.proposal = XXX

carriervisit.departure..towage.start.request = XXX

carriervisit.departure..towage.start.planning = XXX

carriervisit.departure..towage.start.actual = ATS Towage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407662

carriervisit.departure.towage.end

The date/time when the last tug has been released from the vessel

Towage

Towage service provider

Last Tug disconnected or released by the vessel

DCSA #38 Actual Time Completion Towage (ATC Towage) = carriervisit.departure.towage.end.actual

carriervisit.departure.towage.end.schedule = XXX

carriervisit.departure.towage.end.proposal = XXX

carriervisit.departure..towage.end.request = XXX

carriervisit.departure..towage.end.planning = XXX

carriervisit.departure..towage.end.actual = ATC Towage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.departure.pilotage.lasttimepilotonboard

Planned End Pilotage service Departure

Departure

Port, Pilotage

The date/time a pilotage service provider confirms to attend the vessel: whenever ETC is communicated and matching with ‘Pilot Off’ (PD) event.

When the pilot disembarks the vessel after departure

DSCA #40 Actual Time of Completion Pilotage (ATC Pilotage) = carriervisit.departure.pilot.end.actual

carriervisit.departure.pilotage.lasttimepilotonboard.schedule = XXX

carriervisit.departure.pilotage.lasttimepilotonboard.proposal = XXX

carriervisit.departure.pilotage.lasttimepilotonboard.request = XXX

carriervisit.departure.pilotage.lasttimepilotonboard.planning = XXX

carriervisit.departure.pilotage.lasttimepilotonboard.actual = ATC Pilotage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407455

carriervisit.departure.pilot.end

The date/time a pilotage service on the vessel is completed

Pilot

Port, Pilot

End of service.

DSCA #40 Actual Time of Completion Pilotage (ATC Pilotage) = carriervisit.departure.pilot.end.actuaL

carriervisit.departure.pilotage.end.schedule = XXX

carriervisit.departure.pilotage.end.proposal = XXX

carriervisit.departure.pilotage.end.request = XXX

carriervisit.departure.pilotage.end.planning = XXX

carriervisit.departure.pilotage.end.actual = ATC Pilotage

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407248

carriervisit.departure.drift.start

The date/time vessel starts drifting operation

Drift

Carrier

TO BE COMPLETED
(e.g. on “STOP Engine” after reaching drifting position)

no DCSA timestamp available

carriervisit.departure.drift.start.schedule = XXX

carriervisit.departure.drift.start.proposal = XXX

carriervisit.departure.drift.start.request = XXX

carriervisit.departure.drift.start.planning = XXX

carriervisit.departure.drift.start.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000407248

carriervisit.departure.drift.end

The date/ time vessel completes drifting operation

Drift

Carrier

TO BE COMPLETED
(e.g. on “START Engine” after reaching drifting position)

no DCSA timestamp available

carriervisit.departure.drift.end.schedule = XXX

carriervisit.departure.drift.end.proposal = XXX

carriervisit.departure.drift.end.request = XXX

carriervisit.departure.drift.end.planning = XXX

carriervisit.departure.drift.end.actual = XXX

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000243208

carriervisit.departure.anchorage.start

The date/time vessel starts anchorage operation

Anchorage

Carrier

Let go the anchor (arrival to anchorage)

DCSA #97 Actual Time of Start Anchorage Operation (ATS Anchorage Ops) = carriervisit.departure.anchorage.start.actuaL

carriervisit.departure.anchorage.start.schedule = XXX

carriervisit.departure.anchorage.start.proposal = XXX

carriervisit.departure.anchorage.start.request = XXX

carriervisit.departure.anchorage.start.planning = XXX

carriervisit.departure.anchorage.start.actual = ATS Anchorage Ops

https://tic40.atlassian.net/wiki/spaces/CRT/pages/1000243208

carriervisit.departure.anchorage.end

The date/ time vessel completes anchorage operation

Anchorage

Carrier

Anchor heaved in and nested (departure from anchorage)

DCSA #98 Actual Time of Completion Anchorage Operation (ATC Anchorage Ops) = carriervisit.departure.anchorage.end.actual

carriervisit.departure.anchorage.end.schedule = XXX

carriervisit.departure.anchorage.end.proposal = XXX

carriervisit.departure.anchorage.end.request = XXX

carriervisit.departure.anchorage.end.planning = XXX

carriervisit.departure.anchorage.end.actual = ATC Anchorage Ops

Departure

carriervisit.departure.end

Start Of Sea Passage, Departure

Departure

Carrier

The time and the location when the vessel declares the voyage has begun (sea passage) or left the restricted navigation area within the outer port limits as locally defined: when the captain declares SOSP. Vessel position/coordinates required.

DCSA SOSP Start of Sea passage

carriervisit.arrival.end.schedule = XXX

carriervisit.arrival.end.proposal = XXX

carriervisit.arrival.end.request = XXX

carriervisit.arrival.end.planning = XXX

carriervisit.arrival.end.actual = SOSP

View file
nameCarrierVisit Schemes v6.pptx