TIC 4.0

Ready to Collect

CONCEPT

Fields

Type

Description

Purpose

 

Fields

Type

Description

Purpose

 

ID (Concept identifier)

M

readytocollect

GRAMMAR

 

Concept name

M

Ready to Collect

GRAMMAR

 

Concept type

M

action

GRAMMAR

 

Also known as

O

At POW, at row, under RTG, waiting for Cargo, waiting for equipment. At Yard to Collect (AYTC), At Vessel to Collect (AVTC)

TIC Description

 

Definition

M

Concept (status) that describes the action to be performed by the subject (CHE) to execute an order (action type cargo), at the “laden” start location (origin position of the cargo) to pick up the cargo. It starts when the subject (CHE) arrives at the location of the cargo and ends when the cycle starts the laden phase (the cargo is picked). Usually, this action is related to the locking activities (hoist down and spreader locking).

TIC Description

 

Further Detail

O

The start of Ready To Collect is the end of the Moving To Collect or Queuing To Collect activities and the end is when the cargo is locked the first time.

Specific cases, from the equipment point of view:

  • STS Load: The Ship-to-shore spreader stays (CHE not driving or trolleying) without cargo (unlocked spreader) at the location where it has to pick up the cargo, which usually is the Transfer Zone area, (Lane for the trucks or transfer zone for SC/SHC interchange area). Usually, the CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same STS) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject). We recommend defining the subject by trolley and not by CHE.

  • STS Discharge: The Ship-to-shore spreader stays (CHE not driving or trolleying) without cargo (unlocked spreader) at the location where it has to pick up the cargo, which is usually the vessel bay and row. The CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same machine) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject).

  • TT/AGV: The Terminal Tractor or the AGV platform stays (idle or working) without cargo (slot unlocked) within the transfer area, after the Moving To Collect or Queuing To Collect activities. Usually, the TT needs to do the alignment and the idling to facilitate the operation until the container is placed on the platform.

  • RTG/RMG/ARMG/ASC: The Gantry crane spreader stays (idle or working) without cargo (unlocked) within the transfer area, wagon position or cargo location, after the Moving To Collect or Queuing To Collect activities. This area is always over the cargo or carrier slots where the cargo is located.

  • SC/SHC: The Strad or Shuttle Carrier spreader stays (idle or working) without cargo (unlocked) within the cargo location where has to pick up the cargo.

TIC Description

 

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

 

SUBJECT

M

order; che, user

GRAMMAR

 

POINT OF MEASUREMENT

O

pom: output

pomt: actual, estimated

GRAMMAR

 

OBSERVED PROPERTY

M

status, duration, counter, totalcounter, timer, totaltimer, starttimestamp, endtimestamp

GRAMMAR

 

Value

M

boolean

GRAMMAR

 

Related standards

O

 

TIC Description

 

Related TIC 4.0 definition

O

https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0Moving To Collect Queuing To Collect Ready to Collect Collect Deliver Moving To Deliver Queuing to Deliver Ready to Deliver

TIC Description

 

Example

M

A message from the TOS which confirms the job-step status of the terminal truck 01 from the perspective of the order, che and driver:

tos.@.jobinstruction.@.order.@2343.movingtocollect.status.output.actual.value: FALSE.

tos.@.jobinstruction.@.order.@2343.queuingtocollect.status.output.actual.value: FALSE

tos.@.jobinstruction.@.order.@2343.readytocollect.status.output.actual.value: TRUE

tos.@.jobinstruction.@.order.@2343.movingtodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.order.@2343.queuingtodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.order.@2343.readytodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.order.@2343.che.output.actual.id: TT01

 

Optionally the information could be duplicated under the “che” subject. If there are a lot of elements in the che array and subsequently in the same message then it is recomended to use the array identification after the “id”

tos.@.che.@TT01.movingtocollect.status.output.actual.value: FALSE

tos.@.che.@TT01.queuingtocollect.status.output.actual.value: FALSE

tos.@.che.@TT01.readytocollect.status.output.actual.value: TRUE

tos.@.che.@TT01.movingtodeliver.status.output.actual.value: FALSE

tos.@.che.@TT01.queuingtodeliver.status.output.actual.value: FALSE

tos.@.che.@TT01.readytodeliver.status.output.actual.value: FALSE

TIC Description

 

Example in the context of the grammar

M

TIC Description

 

Link to one or more operational processes

M

All the jobinstructions type cargo move.

https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0

 

TIC Description

Search tags

M

#emtpy at row, #at pow,

Technical

 

Version / Date

M

2023.007 - 25/02/2023

Technical

 

Internal TIC Version

M

20230216

Technical

 

M = Mandatory

O = Optional

 

 

 

Introduction to concept type “job-stepping”:

The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity the CHE is doing to move the cargo. There are 6 basic sub processes to perform a move:

  • Moving to Collect

  • Queuing to Collect

  • Ready to Collect

  • Moving to Deliver

  • Queuing to Deliver

  • Ready to Deliver

All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.

 

TT order job stepping for Vessel load - 4 job steps example

TT order job stepping for Vessel discharge- 6 job steps example, geofence available

 

The https://tic40.atlassian.net/l/cp/S8dYAjXu (instruction to execute a sequence of steps) is the natural subject of the job-stepping, so we will include by default the concepts for each step under “order” but these concepts can be used with other subjects like CHE, user, cargo, etc.

 

 

 


Created by

Edited by

Review / Approve

Published

 @Francisco Blanquer Jaraiz 2023-02-16

  @Francisco Blanquer Jaraiz 2023-02-27

 

 

 

  

 

 

 

 

 

 

 

 

 

© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport