CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | movingtodeliver | GRAMMAR |
Concept name | M | Moving To Deliver | GRAMMAR |
Concept type | M | action | GRAMMAR |
Also known as | O | To Vessel to Deliver (TVTD), with cargo, spreader locked, moving laden, driving laden, with cargo driving | TIC Description |
Definition | M | Concept (status) that describes the action to move (displace) and/or trolleying (positioning the spreader) as made by the subject (CHE) laden (locked) while performing an order type cargo from the “laden” start location (X,Y origin position of the cargo, not including Z) to the Waiting To Deliver area or Ready To Deliver transfer zone. | TIC Description |
Further Detail | O | Moving To Deliver is true between when the cargo is locked by the subject and the moment the subject reaches the geofence area for queuing or the cycle laden end location (the end position of the cargo for the cycle process included in the order, usually called drop location). The “drive” and “trolleying” are included in this definition. In general, the areas for the transfer zones and the queuing zone are defined by the terminal. Specific cases:
| TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | M | order; che, | GRAMMAR |
POINT OF MEASUREMENT | O | pom: output pomt: actual, estimated | GRAMMAR |
OBSERVED PROPERTY | M | status, duration, counter, totalcounter, timer, totaltimer, starttimestamp, endtimestamp | GRAMMAR |
Value | M | boolean | GRAMMAR |
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0Moving To Collect Queuing To Collect Ready to Collect Collect Deliver Moving To Deliver Queuing to Deliver Ready to Deliver | TIC Description |
Example | M | A message from the TOS which confirms the job-step status of the terminal truck 01 from the perspective of the order, che and driver: tos.@.jobinstruction.@.order.@2343.movingtocollect.status.output.actual.value: FALSE. tos.@.jobinstruction.@.order.@2343.queuingtocollect.status.output.actual.value: FALSE tos.@.jobinstruction.@.order.@2343.readytocollect.status.output.actual.value: FALSE tos.@.jobinstruction.@.order.@2343.movingtodeliver.status.output.actual.value: TRUE tos.@.jobinstruction.@.order.@2343.queuingtodeliver.status.output.actual.value: FALSE tos.@.jobinstruction.@.order.@2343.readytodeliver.status.output.actual.value: FALSE tos.@.jobinstruction.@.order.@2343.che.output.actual.id: TT01
Optionally the information could be duplicated under the “che” subject. If there are a lot of elements in the che array and subsequently in the same message then it is mandatory to use the array identification after the “id” tos.@.che.@TT01.movingtocollect.status.output.actual.value: FALSE tos.@.che.@TT01.queuingtocollect.status.output.actual.value: FALSE tos.@.che.@TT01.readytocollect.status.output.actual.value: FALSE tos.@.che.@TT01.movingtodeliver.status.output.actual.value: TRUE tos.@.che.@TT01.queuingtodeliver.status.output.actual.value: FALSE tos.@.che.@TT01.readytodeliver.status.output.actual.value: FALSE | TIC Description |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M | All the jobinstructions type cargo move. https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0 | TIC Description |
Search tags | M | #carry underway, #laden | Technical |
Version / Date | M | 2023.007 - 25/02/2023 | Technical |
Internal TIC Version | M | 20230227 | Technical |
M = Mandatory
O = Optional
Introduction to concept type “job-stepping”:
The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity is the CHE doing to move the cargo. There are 6 basic sub processes to perform a move:
Moving to Collect
Queuing to Collect
Ready to Collect
Moving to Deliver
Queuing to Deliver
Ready to Deliver
All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.
TT order job stepping for Vessel load - 4 job steps example
TT order job stepping for Vessel discharge- 6 job steps example, geofence available
The https://tic40.atlassian.net/l/cp/S8dYAjXu (instruction to execute a sequence of steps) is the natural subject of the job-stepping, so we will include by default the concepts for each step under “order” but these concepts can be used with other subjects like CHE, user, cargo, etc.
Created by | Edited by | Review / Approve | Published |
Francisco Blanquer Jaraiz 2023-02-16 | Francisco Blanquer Jaraiz 2023-02-27 |
|
|
|
|
| |