Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

FirstTimeTerminalBerthReadyForArrivalfirsttimeterminalberthreadforyarrival

GRAMMAR

Concept name

M

FirstTimeTerminalBerthReadyForArrival

GRAMMAR

Concept type

M

Event

GRAMMAR

Also known as

OTerminal ready for start Operations

Berth Free, Truck Allowed, Rail Free, Slot free, Allowed to get in.

TIC Description

Definition

M

Event when a carrier the terminal berth or transferzone is first time ready to receive a specific CarrierVisit (vessel, barge, rail, truck) reports First time readiness for cargo operations as reported by the carrier to the terminal according to local regulationsTerminalBerthReadyForArrival is first time true for a specific carrier visit.

TIC Description

Further Detail

O

CarrierFirstTimeReadyToWork FirstTimeTerminalBerthReadyForArrival is a sub-concept of the subject (process) CarrierVisit.

Image RemovedImage Added

Vessel:

Event when the vessel terminal reports First time readiness for cargo operations as reported by the specific vessel to the terminal according to local regulationsvisit the status TerminalBerthReadyForArrival: berth is free for mooring (there is no other vessel or barge that may interfere); STS interference is clear.

Truck:

Event when the terminal reports for the specific truck is First Time ready to be unloaded/loaded with cargo, i.e. when the truck is in the transfer area and confirms that it can be loaded/unloadedvisit the status TerminalBerthReadyForArrival: the transferzone is free to park (mooring) (there is no other truck or trailer that may interfere), CHE interference is clear (ASC, SC).

Rail:

Event when the terminal reports for the specific train is First Time ready to be loaded or unloaded. This is determined either manually (output) (e.g. “walk the train” to achieve readiness for cargo operationsvisit the status TerminalBerthReadyForArrival: the rail is free to stop (mooring) (there is no other train or obstacule that may interfere), CHE interference is clear (RTG, RMG, RS, etc).

TIC Description

Required Information

M

SUBJECT and VALUE

TIC Description

SUBJECT

 

#Carrier#carriervisit

 

POINT OF MEASUREMENT

 

#input;#internal_in ; #internal_out #iinput; #ioutput;#output

#planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status#time; #duration; #timer; #totaltimer; #startevent; #startcounter; #endevent; #endcounter#logical; #coordinate

 

Value

 TRUE; FALSE;

time: ISO8601

coordinate: WGS84

 

Related standards

O

  JIT Port call Data definitions 1.2 (June 2022)  

TIC Description

Related TIC 4.0 definition

O

CarrierVisit Carrier Arrival TerminalOperations Departure

TIC Description

Example

M

tos.@.carriervisit.carrierfirsttimereadytowork: TRUE = The carrier is ready to be operated or for any other cargo operations to be carried out.@.firsttimeterminalberthreadforyarrival.output.actual.time: =2022-04-26T10:00:00.000Z = The terminal is ready to start Operations for the specific carriervisit first time.

TIC Description

Example in the context of the grammar

M

 

Image Added

TIC Description

Link to one or more operational processes

M

 

TIC Description

Search tags

M

 

Technical

Version / Date

M

2022.006 - 1/12/2022

Technical

Internal TIC Version

M

definition technical group20221121

Technical

M = Mandatory

O = Optional

 

View file
nameCarrierVisit Schemes v6.pptx

...

 

Created by

Edited by

Review / Approve

Published

 RBS EMEA 2022-10-20

 Francisco Blanquer Jaraiz

20221121 

 

 

 2022-10-20