Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

readytocollect

GRAMMAR

Concept name

M

Ready to Collect

GRAMMAR

Concept type

M

action

GRAMMAR

Also known as

O

At POW, at row, under RTG, waiting for Cargo, waiting for equipment. At Yard to Collect (AYTC), At Vessel to Collect (AVTC)

TIC Description

Definition

M

Concept (status) that describes the action that is going to perform be performed by the subject (CHE) to execute an order (action type cargo), at the “laden” start location (origin position of the cargo) to pick up the cargo. It starts when the subject (CHE) arrives at the location of the cargo and ends when the cycle starts the laden phase (the cargo is picked). Usually, this action is related to the locking activities (hoist down and spreader locking).

TIC Description

Further Detail

O

The start of Ready To Collect is the end of the Moving To Collect or Queuing To Collect activities and the end is just when the cargo is locked the first time.

Specific cases, from the equipment point of view:

  • STS Load: The Ship-to-shore spreader stays (CHE not driving or trolleying) without cargo (unlocked spreader) at the location where it has to pick up the cargo, which usually is the Transfer Zone area, (Lane for the trucks or transfer zone for SC/SHC interchange area). Usually, the CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same machineSTS) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject). We recommend defining the subject by trolley and not by CHE.

  • STS Discharge: The Ship-to-shore spreader stays (CHE not driving or trolleying) without cargo (unlocked spreader) at the location where it has to pick up the cargo, which is usually the vessel bay and row. The CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same machine) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject).

  • TT/AGV: The Terminal Tractor or the AGV platform stays (idle or working) without cargo (slot unlocked) within the transfer area, after the Moving To Collect or Queuing To Collect activities. Usually, the TT needs to do the alignment and the idling to facilitate the operation till until the container is placed on the platform.

  • RTG/RMG/ARMG/ASC: The Gantry crane ot ASC spreader stays (idle or working) without cargo (unlocked) within the transfer area, wagon position or cargo location, after the Moving To Collect or Queuing To Collect activities. This area is always over the cargo or carrier slots where is the cargo is located.

  • SC/SHC: The Straddle Strad or Shuttle Carrier spreader stays (idle or working) without cargo (unlocked) within the cargo location where has to pick up the cargo.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

M

order; che, user

GRAMMAR

POINT OF MEASUREMENT

O

pom: output

pomt: actual, estimated

GRAMMAR

OBSERVED PROPERTY

M

status, duration, counter, totalcounter, timer, totaltimer, starttimestamp, endtimestamp

GRAMMAR

Value

M

boolean

GRAMMAR

Related standards

O

TIC Description

Related TIC 4.0 definition

O

https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0Moving To Collect Queuing To Collect Ready to Collect Collect Deliver Moving To Deliver Queuing to Deliver Ready to Deliver

TIC Description

Example

M

A message from the TOS with that which confirms the job-step status of the terminal truck 01 from the perspective of the order, che and driver:

tos.@.jobinstruction.@.oderorder.@2343.movingtocollect.status.output.actual.value: FALSE.

tos.@.jobinstruction.@.oderorder.@2343.queuingtocollect.status.output.actual.value: FALSE

tos.@.jobinstruction.@.oderorder.@2343.readytocollect.status.output.actual.value: TRUE

tos.@.jobinstruction.@.oderorder.@2343.movingtodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.oderorder.@2343.queuingtodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.oderorder.@2343.readytodeliver.status.output.actual.value: FALSE

tos.@.jobinstruction.@.oderorder.@2343.che.output.actual.id: TT01 

Optionally the information could be duplicate duplicated under the “che” subject. If there are many a lot of elements in the che array then and subsequently in the same message then it is mandatory recomended to use the array identification after the “id”

tos.@.che.@TT01.movingtocollect.status.output.actual.value: FALSE

tos.@.che.@TT01.queuingtocollect.status.output.actual.value: FALSE

tos.@.che.@TT01.readytocollect.status.output.actual.value: TRUE

tos.@.che.@TT01.movingtodeliver.status.output.actual.value: FALSE

tos.@.che.@TT01.queuingtodeliver.status.output.actual.value: FALSE

tos.@.che.@TT01.readytodeliver.status.output.actual.value: FALSE

TIC Description

Example in the context of the grammar

M

TIC Description

Link to one or more operational processes

M

All the jobinstructions type cargo move.

https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0

TIC Description

Search tags

M

emtpy #emtpy at row, at #at pow,

Technical

Version / Date

M

2023.007 - 25/0302/2023

Technical

Internal TIC Version

M

20230216

Technical

...

The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity the CHE is doing the CHE to move the cargo. There are 6 basic subprocesses sub processes to perform a move:

  • Moving to Collect

  • Queuing to Collect

  • Ready to Collect

  • Moving to Deliver

  • Queuing to Deliver

  • Ready to Deliver

All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.

Image RemovedImage Added

TT order job stepping for Vessel load - 4 job steps example

...