CONCEPT
Fields | Type | Description | Purpose | |
---|---|---|---|---|
ID (Concept identifier) | M | readytocollect | GRAMMAR | |
Concept name | M | Ready to Collect | GRAMMAR | |
Concept type | M | action | GRAMMAR | |
Also known as | O | At POW, at row, under RTG, waiting for Cargo, waiting for equipment. At Yard to Collect (AYTC), At Vessel to Collect (AVTC) | TIC Description | |
Definition | M | Concept (status) that describes the action that is going to perform be performed by the subject (CHE) to execute an order (action type cargo), at the “laden” start location (origin position of the cargo) to pick up the cargo. It starts when the subject (CHE) arrives at the location of the cargo and ends when the cycle starts the laden phase (the cargo is picked). Usually, this action is related to the locking activities (hoist down and spreader locking). | TIC Description | |
Further Detail | O | The start of Ready To Collect is the end of the Moving To Collect or Queuing To Collect activities and the end is just when the cargo is locked the first time. Specific cases, from the equipment point of view:
| TIC Description | |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description | |
SUBJECT | M | order; che, user | GRAMMAR | |
POINT OF MEASUREMENT | O | pom: output pomt: actual, estimated | GRAMMAR | |
OBSERVED PROPERTY | M | status, duration, counter, totalcounter, timer, totaltimer, starttimestamp, endtimestamp | GRAMMAR | |
Value | M | boolean | GRAMMAR | |
Related standards | O | TIC Description | ||
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0Moving To Collect Queuing To Collect Ready to Collect Collect Deliver Moving To Deliver Queuing to Deliver Ready to Deliver | TIC Description | |
Example | M | A message from the TOS with that which confirms the job-step status of the terminal truck 01 from the perspective of the order, che and driver: tos.@.jobinstruction.@.oderorder.@2343.movingtocollect.status.output.actual.value: FALSE. tos.@.jobinstruction.@.oderorder.@2343.queuingtocollect.status.output.actual.value: FALSE tos.@.jobinstruction.@.oderorder.@2343.readytocollect.status.output.actual.value: TRUE tos.@.jobinstruction.@.oderorder.@2343.movingtodeliver.status.output.actual.value: FALSE tos.@.jobinstruction.@.oderorder.@2343.queuingtodeliver.status.output.actual.value: FALSE tos.@.jobinstruction.@.oderorder.@2343.readytodeliver.status.output.actual.value: FALSE tos.@.jobinstruction.@.oderorder.@2343.che.output.actual.id: TT01 Optionally the information could be duplicate duplicated under the “che” subject. If there are many a lot of elements in the che array then and subsequently in the same message then it is mandatory recomended to use the array identification after the “id” tos.@.che.@TT01.movingtocollect.status.output.actual.value: FALSE tos.@.che.@TT01.queuingtocollect.status.output.actual.value: FALSE tos.@.che.@TT01.readytocollect.status.output.actual.value: TRUE tos.@.che.@TT01.movingtodeliver.status.output.actual.value: FALSE tos.@.che.@TT01.queuingtodeliver.status.output.actual.value: FALSE tos.@.che.@TT01.readytodeliver.status.output.actual.value: FALSE | TIC Description | |
Example in the context of the grammar | M | TIC Description | ||
Link to one or more operational processes | M | All the jobinstructions type cargo move. https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0 | TIC Description | |
Search tags | M | emtpy #emtpy at row, at #at pow, | Technical | |
Version / Date | M | 2023.007 - 25/0302/2023 | Technical | |
Internal TIC Version | M | 20230216 | Technical |
...
The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity the CHE is doing the CHE to move the cargo. There are 6 basic subprocesses sub processes to perform a move:
Moving to Collect
Queuing to Collect
Ready to Collect
Moving to Deliver
Queuing to Deliver
Ready to Deliver
All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.
TT order job stepping for Vessel load - 4 job steps example
...