SUBJECT
Fields | Type | Description | Purpose |
ID (subject identifier) | M | closingatdeparture | GRAMMAR |
subject name | M | ClosingAtDeparture | GRAMMAR |
subject type | M | process | GRAMMAR |
Also known as | O | boom-up, after operations | TIC Description |
Definition | M | ClosingAtDeparture is a process of TerminalOperations by which a subject (usually a Terminal) facilitates the Carrier, that belongs to a CarrierVisit process, leaving the terminal after ends the CargoOperations and includes all the subject activities necesary to ends the Terminals operations related to the CarrierVisit. |
|
Further Detail | O | closingatdeparture ClosingAtDeparture is consider “active” if the resources are in place ready to perform the activity (loading, unloading or moving cargodriving, booming, hoisting, standby). The ClosingAtDeparture “start” will define the first time the process is active and the end “end” the last time during the CarrierVisit. During the terminal operations ClosingAtDeparture the process could be inactive because the resources are not in place (ie suspension of operations because high wind)one CHE iniciates and ends the ClosingAtDeparture process but others are still active in the CargoOperations. carriervisit.terminaloperations.closingatdeparture is a subprocess of TerminalOperations process:
Preparation at arrival and closing at departure: Preparation and closing are necessary to execute the terminal operation, therefore they are included within terminal operations. Preparation and closing could be active before/after as they are preparatory/finalizing works. It is a preparatory/finalizing work before/after the terminal operations process start/ends and can be considered “active”. So preparation will always “start” before the terminal operations “start” and the closing will always “end” after terminal operations “end” because are activities that needs to be done before and after the terminal operations. Considerations per Carrier type: Vessel:
Truck:
Rail:
| TIC Description |
Required Information | M | CarrierVisit id | TIC Description |
SUBJECT |
| carriervisit; preparationatarrival; cargooperations; lashing; closingatdeparture |
|
CONCEPT |
| id, name, active, inactive, idle, working, start, end |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/c/3RUk3VuD Arrival https://tic40.atlassian.net/l/c/H6AHQTgPhttps://tic40.atlassian.net/l/c/V7pHyb1Shttps://tic40.atlassian.net/wiki/pages/resumedraft.action?draftId=953319752&draftShareId=e8641c16-ded6-4349-98fc-fc8a0ac5fde7 Departure /l/c/2dVQBRjY https://tic40.atlassian.net/l/c/T5XGh24c Cargo Operations Lashing | |
Example | M | carriervisit.terminaloperations.preparationatarrival.start.time.output.actual = visit.terminaloperations.preparationatarrival..end.time.output.actual = | |
Example in the context of the grammar | M | ||
Link to one or more operational processes | M |
| |
Search tags | M | Operations; cargo operations; vessel operations; truck operations; train operations; cargo operations; port operations; terminal activities; load; discharge; unload; loading; discharging. | |
Version / Date | M | 2022.005 - 01/10/2022 | |
Internal TIC Version | M | 20220622 |
...