Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

SUBJECT

Fields

Type

Description

Purpose

ID (subject identifier)

M

shorepower

GRAMMAR

subject name

M

ShorePower

GRAMMAR

subject type

M

process

GRAMMAR

Also known as

O

Shore Power, plug, OPS

TIC Description

Definition

M

ShorePower is a sub-process of TerminalOperations by which a subject (usually the terminal’s personnel) or carrier (carrier’s personnel) performs the operation to connect/disconnect the external energy supply systems in ports from/to the carrier

 

Further Detail

O

Shore Power is considered “active” if the resources are in place ready to perform the activity (connecting or disconnecting the cable). The “start” will define the first time the process is active and the end the last time. During the terminal operations the process could be inactive because the resources are not in place.

carriervisit.terminal operations.shorepower is a subprocess of TerminalOperations process:

Nota

image to be updated

  • carriervisit.terminaloperations.shorepower.active status is when the terminal or carrier has first allocated the personnel to proceed with the plugging/unplugging operation for the specific carrier visit OR the carrier is plugged.

  • carriervisit.terminaloperations.shorepower.start is when the terminal carrier operator or 3rd party (terminal’s or carrier's personnel) connect at least one plug to the carrier.

  • carriervisit.terminaloperations.shorepower.end is when the last shorepower plug is disconnected from the carrier.

TIC Description

Required Information

M

CarrierVisit

TIC Description

SUBJECT

 

carriervisit, terminaloperations

 

CONCEPT

 

id, name, active, inactive, working, start, end, plugging

 

Related standards

O

 IEC 80005-1 defines the standard for medium-voltage connections and IEC 80005-3 for supply of low-voltage connections.

TIC Description

Related TIC 4.0 definition

O

https://tic40.atlassian.net/l/c/3RUk3VuD https://tic40.atlassian.net/wiki/pages/resumedraft.action?draftId=1000407869 TerminalOperations Departure Inbound Check-In Dwell CargoVisit Check-out Outbound Lashing

Example

M

carriervisit.id = MLT1974

tos.@.carriervisit.@.terminaloperations.@.shorepower.@.start.time.output.actual =2021-11-15T15:14:01.352Z

tos.@.carriervisit.@.terminaloperations.@.shorepower.@.end.time.output.actual =2021-11-16T15:14:01.352Z

Example in the context of the grammar

M

Link to one or more operational processes

M

 

Search tags

M

arrival, carrier, carriervisit, departure, inbound, outbound, cargooperations, anchorage, drift, pilot, towage, mooring, portgate, terminalgate, pregate

Version / Date

M

2022.006 - 1/12/2022

Internal TIC Version

M

2022112120230313

...

 

View file
nameCarrierVisit Schemes v6.pptx

...