TIC 4.0
Not available and Is Planned
CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | notavailable_and_isplanned | GRAMMAR |
Concept name | M | Not available and Is Planned | GRAMMAR |
Concept type | M | Status | GRAMMAR |
Also known as | O | Planned | TIC Description |
Definition | M | Subject is not available to be used or obtained due to a planned closure .(event notified at least 12 hours in advance) | TIC Description |
Further Detail | O | This concept can be used for multiple subjects:
| TIC Description |
Required Information | M |
| TIC Description |
SUBJECT |
| Terminal, Throughput, Performance, Berth, Yard, Gate, CHE |
|
POINT OF MEASUREMENT |
| Scheduled, Actual, estimated |
|
OBSERVED PROPERTY |
| status; duration; counter; totalcounter; timer; totaltimer |
|
Value |
| status: boolean; duration and timer: seconds, totaltimer: hour. |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | Is Scheduled Is Planned https://tic40.atlassian.net/wiki/spaces/TIC40Definitions/pages/1545666561 Not available and Is Planned Terminal Closed Is Scheduled Terminal Closed Is Planned | TIC Description |
Example | M | Terminal “not available and was planned”, The terminal is open and accessible. tos|@|terminal|@|notavailable_and_isplanned|status|output|actual|value = true Terminal has been “not available and was planned” (closed due to scheduled closures) during the last year during a total of 14 days tos|@|terminal|@|notavailable_and_isplanned|status|output|actual|#unit#day|timer= 14 CHE “not available scheduled”, The CHE is not ready to receive orders due to a scheduled closure tos|@|che|@|notavailable_and_isplanned|status|output|actual|value = true Position “not available and was planned”, a specific position in the yard is “not available” due to a scheduled event (for example, maintenance operations). tos|@|position |@|notavailable_and_isplanned|status|output|actual|value = true | TIC Description |
Example in the context of the grammar | M |
| TIC Description |
Link to one or more operational processes | M | terminal closed planned, terminal planned, holidays | TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 20241120 | Technical |
Internal TIC Version | M | notavailableandisplanned | Technical |
M = Mandatory
O = Optional
© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport