TIC 4.0
Single
CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | single | GRAMMAR |
Concept name | M | Single | GRAMMAR |
Concept type | M | Status | GRAMMAR |
Also known as | O | 1x20; 1x30; 1x40; 1x45, Single move | TIC Description |
Definition | M | Operational mode to perform one payload (box) in one cycle regardless of the size of the payload. | TIC Description |
Further Detail | O | Single can be used as a concept to describe the status of the spreader or as a unit of the value that results to perform a move of a cycle. In case represents a value it means that the concept was executed in single status. | TIC Description |
Required Information | M | SUBJECT and VALUE | TIC Description |
SUBJECT |
| #Spreader; #Cycle |
|
POINT OF MEASUREMENT |
| #input;#iinput; #ioutput;#output #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #status; #counter; #duration; #timer; #totaltimer |
|
Value |
| When is used as a concept of status: TRUE; FALSE; boolean When is used as a value has to be a entire natural number (positive). |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | "che.@.spreader.@.single.status.output.actual.value": "true", = The spreader of container handling eqp. is in single operational mode "che.@.cycle.@.move.counter.ouput.actual.single: "1", = The CHE has performed 1 single move cycle. | TIC Description |
Example in the context of the grammar | M |
| TIC Description |
Link to one or more operational processes | M | Cycles performed by CHE. | TIC Description |
Search tags | M |
| Technical |
Version / Date | M | 2022.006 1/12/2022 | Technical |
Internal TIC Version | M | Spreader taskforce group 20221109 | Technical |
M = Mandatory
O = Optional
Created by | Edited by | Review / Approve | Published |
Hans Svanfeldt | Hans Svanfeldt | @Francisco Blanquer Jaraiz 20221111 |
|
|
|
|
|
© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport