TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 25 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

move

GRAMMAR

Concept Name

M

Move

GRAMMAR

Concept Type

M

move

GRAMMAR

Also known as

O

cycle; boxes; load; discharge; Container Move; work done; discharge, load.

TIC Description

Definition

M

Move is the action of displacing a payload by a subject.

TIC Description

Further Detail

O

Move it is a concept within the TIC 4.0 semantic (ontology) so it describes the action of a subject (usually the subject is the https://tic40.atlassian.net/l/c/0ZyiYd00 process).

Move must refer to the subject which made the action (usually the subject that is performing the CYCLE process).

Depending on the point of measurement of the process MOVE can refer to a cycle which already “started” (ended or not ended) or a cycle already “ended” (if it is ended always is started). This is very relevant in long processes like a terminal.cycle.move where there could be a lot of cycle.move that have been started but not finished.

Move can be associated with a continuous system-process (liquid bulk, gas, belt conveyor) or to a discrete system-process, being in that case necessary to consider cycles to describe the nature of the Move (single, multi or simultaneous).

For some cycle processes running in parallel or serial like for terminal.cycle the “move” action might be conducted by more than one subsubjects (several CHEs).

TIC Description

Required Information

M

SUBJECT; POINT OF MEASUREMENT;OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

 

#cycle (process)

 

POINT OF MEASUREMENT

 

POM: #input;#output

POMT: #schedule; #planning; #estimated; #actual; #performed

POMP: (Point of Measurement Process) represents if the value refers to a process that has been initiated or completed. #started; #ended

  1. Started: process initiated but not necessarily completed

  2. Ended: process completed. (default)

 

OBSERVED PROPERTY

 

#counter; #totalcounter; #volume; #distance

 

Value

 

  1. value (cycles)

  2. box

  3. TEU

  4. 20foot

  5. 30foot

  6. 40foot

  7. 45foot

  8. single

  9. twin

  10. double

  11. tandem

  12. quad

  13. hatchcover

  14. lashingcage

  15. breakbulk

  16. bundle

  17. gearbox

  18. Coil

  19. Ton

  20. m3

  21. Hm3

 

Related standards

O

 TEU definition; Container definition; ISO 8601

TIC Description

Related TIC 4.0 definition

O

https://tic40.atlassian.net/l/c/BYG0RbF1 https://tic40.atlassian.net/l/c/uF2W63Ut] https://tic40.atlassian.net/l/c/0X0Ad1XRo Laden; Unladen; Paid; Unpaid; Useful; UnUseful;https://tic40.atlassian.net/wiki/spaces/REV/pages/420643176/Single+Review?atlOrigin=eyJpIjoiZDAyMDQ3MmEyZTMwNGM2ODk2YTBjZjJkMmNmNzE4ZTUiLCJwIjoiYyJ9] https://tic40.atlassian.net/l/c/0yoXXmak]https://tic40.atlassian.net/l/c/rSFwbtAG)https://tic40.atlassian.net/l/c/UXknxhhc0; Hatchcover; Lashing cage; Breakbulk; Bundle; Gearbox; CHain; OHF; double Spreader; Doule trolley; solid bulk; double Boom; Multitrolley

TIC Description

Example

M

See below

TIC Description

Example in the context of the grammar

M

che.cycle.move

{
  "msg": {
    "id": "",
    "sender": "",
    "timestamp": "2021-08-30T14:20:39.029Z",
    "topic": "",
    "destination": "",
    "creationtimestamp": "2021-08-30T14:20:39.029Z",
    "starttimestamp": "2021-08-30T14:20:39.029Z",
    "endtimestamp": "2021-08-30T14:20:39.029Z",
    "version": "2021.2"
  },
  "che": [
    {
      "id": "",
      "cycle": [
        {
          "id": "",
          "move": {
            "counter": [
              {
                "pom": "output",
                "pomt": "actual",
                "timestamp": "2021-08-30T14:20:39.029Z",
                "starttimestamp": "2021-08-30T14:20:39.029Z",
                "endtimestamp": "2021-08-30T14:20:39.029Z",
                "value": 1,
                "box": 1,
                "teu": 2,
                "20foot": 0,
                "30foot": 0,
                "40foot": 1,
                "45foot": 0,
                "single": 1,
                "twin": 0,
                "double": 0,
                "tandem": 0,
                "quad": 0,
                "hatchcover": 0,
                "lashingcage": 0,
                "breakbulk": 0,
                "bundle": 0,
                "gearbox": 0
              }
            ],
            "totalcounter": [
              {
                "pom": "output",
                "pomt": "actual",
                "timestamp": "2021-08-30T14:20:39.030Z",
                "value": 0,
                "box": 0,
                "teu": 0,
                "20foot": 0,
                "30foot": 0,
                "40foot": 0,
                "45foot": 0,
                "single": 0,
                "twin": 0,
                "double": 0,
                "tandem": 0,
                "quad": 0,
                "hatchcover": 0,
                "lashingcage": 0,
                "breakbulk": 0,
                "bundle": 0,
                "gearbox": 0
              }
            ],
            "volume": [
              {
                "pom": "output",
                "pomt": "actual",
                "timestamp": "2021-08-30T14:20:39.030Z",
                "unit": "m3",
                "value": ""
              }
            ]
          }
        }
      ]
    }
  ]
}

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

Technical

Version / Date

M

TIC_Q3_2021 / 30.08.2021

Technical

Internal TIC Version

M

definition technical group/1st revision semantic

Technical

M = Mandatory

O = Optional


Draws

(optional) add some draws to explain the concept

Standard STS examples

 

 

Single move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=1

 

Twin move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=2

 

Tandem move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=2

 

Quad move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=4

 

Hatchcover move

che.cycle.move.counter.value=1

che.cycle.move.counter.hatcover=1

 

Lashing cage move

che.cycle.move.counter.value=1

che.cycle.move.counter.lashingcage=1

 

Breakbulk move

che.cycle.move.counter.value=1

che.cycle.move.counter.breakbulk=1

 

Bundle move

che.cycle.move.counter.value=1

che.cycle.move.counter.breakbulk=4

 

Gearbox move

che.cycle.move.counter.value=1

che.cycle.move.counter.gearbox=1

 

Chain move

che.cycle.move.counter.value=1

che.cycle.move.counter.breakbulk=1

 

OHF move

che.cycle.move.counter.value=1

che.cycle.move.counter.ohf=1

Other cranes examples

 

Double spreader move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=3

 

Double trolley move (doble hoist with buffer and backreach trolley)

che.cycle.move.counter.value=6

che.cycle.move.counter.box=4

note: 2 cycle waterside trolley+4 cycles backreach trolley (single)=5 cycles

 

Double trolley move (double hoist with buffer)

che.cycle.move.counter.value=7

che.cycle.move.counter.box=5

note: 2 cycle waterside trolley +5 backreach trolley (single)=7 cycles (independent)

 

Double trolley move (with buffer)

che.cycle.move.counter.value=5

che.cycle.move.counter.box=6

note: 2 waterside trolley (tandem)+3 backreach trolley (quad)= 5 cycles

 

Solid bulk Bivalve Grab

che.cycle.move.counter.value=1

che.cycle.move.counter.breakbulk=1

che.cycle.move.volume.value=6 (m3)

 

Solid/liquid/gas with pipeline

che.cycle.move.counter.value=1

che.cycle.move.counter.breakbulk=1

che.cycle.move.volume.value=600 (m3)

Note: it requires starttimestamp & endtimestamp

[1]

Double boom double trolley move

che.cycle.move.counter.value=4

che.cycle.move.counter.box=4

note: 1+1+1+1 = 4 cycles (independent)

 [2]

Double trolley (first continuous) move (with buffer)

che.cycle.move.counter.value=2

che.cycle.move.counter.box=1

note: 1+1=2 cycles (independent)

Horizontal transport examples

 

Terminal Tractor single move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=1

 

Terminal Tractor double move

che.cycle.move.counter.value=1

che.cycle.move.counter.box=2

 TT cycle ends when RTG attach both containers

 

Terminal Tractor double move (2 deliveries in same place)

che.cycle.move.counter.value=1

che.cycle.move.counter.box=2

 Each TT cycle ends when RTG attach each  container

 

Terminal Tractor double move (2 deliveries)

che.cycle.move.counter.value=2

che.cycle.move.counter.box=2

 Each TT cycle ends when each RTG attach the  container

Yard examples

 

Yard single move in

che.cycle.move.counter.value=1

che.cycle.move.counter.box=1

 

Yard double move in

che.cycle.move.counter.value=1

che.cycle.move.counter.box=2

 

Diagrams

(optional) add some process diagram which concept belongs

[1]   Konecranes https://www.konecranes.com/resources/next-generation-sts-cranes-provide-model-for-the-future

[2]   Unknown author.

Created by

Edited by

Review / Approve

Published

Valenciaport Foundation

Kalmar TIC delegates

Francisco Blanquer Jaraiz

20/10/2021

26/10/2021

  • Sin etiquetas