TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 17 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

off

GRAMMAR

Concept name

M

Off

GRAMMAR

Concept type

M

status

GRAMMAR

Also known as

O

Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off; turned off; Out of operations; idle; not running;

TIC Description

Definition

M

If the main power supply and all subject systems are not ready to operate (do the job it has been designed for) the subject in less than 2 seconds or requires more than one operation action (a sequence) then TRUE else FALSE

TIC Description

Further Detail

O

This definition is complementary to the “On” concept. If “On” is TRUE then “Off” is FALSE and vice-versa.

If the power subject system is not able to supply the energy for normal operation or the “control” of the subject is “off” or any of the subject systems or subsystems is not ready to run the subject for its normal “job” in less than 2 seconds (default standby_to_operative_timer = 2) or it is required an operator sequence actions then it is considered off.

If you are moving from On to Off and you can not stop the process to return to On in less than 2 (default standby_to_operative_timer = 2) seconds then you are Off.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

M

#CHE; #Gate; #Terminal; #TOS ; #Luminary

GRAMMAR

POINT OF MEASUREMENT

O

#input;#internal_in ; #internal_out ;#output

#schedule; #planning; #estimated; #actual; #performed

GRAMMAR

OBSERVED PROPERTY

M

#status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter

standby_to_operative_timer = 2 (default)

GRAMMAR

Value

M

TRUE; FALSE; integer; real number;

GRAMMAR

Related standards

O

N/A

TIC Description

Related TIC 4.0 definition

O

#on; #on_standby

TIC Description

Example

M

che_off_status: TRUE = the Container Handler Equipment is not ready to operate or do its job properly in less than 2 seconds because no power, no control or any of its systems is not able to be ready on time. (E.g an RTG crane diesel engine is running, but the variable frequency drives are not switched on so an action and/or more than 2 seconds are needed to start and activity and move to on/on_standby status.)

che_spreader_off_status: FALSE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 seconds.

che_engine_off_status: TRUE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 seconds.

TOS_off_status: TRUE = the complete system is not running and does not allow users or machines to login.

TIC Description

Example in the context of the grammar

M

An RTG with the Engine On but the drivers off and the control off

che_engine_off_status: FALSE; che_drivers_off_status: TRUE; che_control_off_status: TRUE; che_off_status: TRUE

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

M

#OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working

Technical

Version / Date

M

TIC_Q4_2020 / 15.09.2020

Technical

Internal TIC Version

M

definition technical group

Technical

M = Mandatory

O = Optional


JSON:

XML:

MQTT:

Created by

Edited by

Review / Approve

Published

  • Sin etiquetas