CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | off | GRAMMAR |
Concept name | M | Off | GRAMMAR |
Concept type | M | status | GRAMMAR |
Subject Tag | M | #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL | GRAMMAR |
Also known as | O | Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off | TIC Description |
Definition | M | If the main power supply is available to operate in less than 2 seconds then false else true | TIC Description |
Further Detail | O | If the machine is not able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is no main power supply running (ie che_on_standby : true) This definition is complementary to che_on | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate | ||
POINT OF MEASUREMENT | affect all the subject so it doesn't make sense to measure in one point. | ||
OBSERVED PROPERTY | #status; #counter; #duration; #timer; #power; #energy; | ||
Value | TRUE; FALSE; real number; integer | ||
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | #On; #On_Standby | TIC Description |
Example | M | che_off_status: TRUE = the Container Handler Equipment is not ready to have the power to work properly in less than 2 seconds. che_spreader_off_status: TRUE = the Spreader of the Container Handler Equipment is not ready to have automatically the power to work properly (lock-unlock-expand-contract) in less than 2 seconds. che_engine_off_status: FALSE the Engine of the Container Handler Equipment is not ready to have the power to work properly (give power to the crane) in less than 2 seconds. | TIC Description |
Example in the context of the grammar | M | A RTG with the Engine On but the drivers off and the spreader pump off che_off_status: TRUE; che_spreader_off_status: TRUE; che_engine_off_status: FALSE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
M = Mandatory
O = Optional
OLD PROPOSAL
CONCEPT
ID | 36 |
Name | CHE Activity Off |
Abbreviation | che.activity.off.command||request||feedback||action.status||counter||timer||energy||distance |
Category | (optional) Tag (Activity, Move, Functional, Operational, OS, etc) groups at a high level the property concept and establish a hierarchy. It is a tag that helps to identify and describe the property. The objective helps the human to classify, find, use the properties. Ie: move; activity; functional, operational, control, TOS. One concept can have several families but must be a closed list. |
Also known as | Engine off; power supply off |
Definition | If main power supply is available to operate in less than 2 seconds then false else true |
Further Detail | If the machine is able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is not main power supply running (ie CHE_Activity_On_Standby : true This definition is complementary to CHE_Activity_On_Standby |
Required | |
Related standards | |
Related TIC 4.0 definition |
HEADER
Identifies the message in origin, destination, time and unique reference (use this link for more information)
Mandatory | Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end |
Optional | (Header topic; Header identifier) |
SUBJECT
Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information)
Default | Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable) |
Suitable | Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples) |
POINT OF MEASUREMENT
It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information)
Default | IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified) |
Optional | Control (from where) |
OBSERVED PROPERTY
It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information)
Default | Status; %; Speed; Counter; Distance; Timer; Energy; Average; … |
Suitable | Specify units when they are different than the International System |
Units | True/False |
Draws
(optional) add some draws to explain the concept
Diagrams
(optional) add some process diagram which concept belongs
Attached documents
(optional) add some document to explain the concept
Examples
Human
1.20191205 12:00 London-Gate03 move “get_in” “out=result” actual boxes “1”
2.20191205 12:06 London-TZ01 move “occupied” in actual boxes “1”
3.20191205 12:18 London-SC74 move “in” actual boxes “1” (waiting for orders)
4.20191205 12:22 London-SC74 move “Lock” actual boxes “1”
5.20191205 12:22 London-TZ01 move out actual boxes “1”
6.20191205 12:32 London-Yard_A-34B56 move “occupied” in actual boxes “1”
JSON:
XML:
MQTT:
Created by | Edited by | Review / Approve | Published |