TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 7 Siguiente »

SUBJECT

Fields

Type

Description

Purpose

ID (subject identifier)

M

preparationatarrival

GRAMMAR

subject name

M

PreparationAtArrival

GRAMMAR

subject type

M

process

GRAMMAR

Also known as

O

idle time before Cargo Operations, before Operations,

TIC Description

Definition

M

PreparationAtArrival is a process of TerminalOperations by which a subject (usually a terminal) facilitates the Carrier, that belongs to a carrier visit process, to start TerminalsOperations and includes all the subject activities necessary to start CargoOperations.

 

Further Detail

O

preparationatarrival is considered “active” if the resources are in place and ready to perform the activity (loading, unloading, or moving cargo or documentation preparation). The “start” will define the first time the process is active and the end the last time. During the TerminalOperations the process could be inactive because the resources are not in place (e.g. suspension of operations due to high wind, resources not available).

carriervisit.terminaloperations.preparationatarrival is a subprocess of TerminalOperations process:

  • carriervisit.terminaloperations.preparationatarrival  “start” event is when an assigned CHE executes the first activity related to a specific carrier visit for initiating the preparationatarrival process

  • carriervisit.terminaloperations.preparationatarrival  “end” event is when the first container move is completed by an assigned CHE related to a specific carrier visit closing the preparationatarrival process and starting the cargooperations process

Preparation at arrival and closing at departure: Preparation and closing are necessary to execute the terminal operation; therefore are included within terminal operations. Preparation and closing could be active before/after as they are preparatory/finalizing works. It is a preparatory/finalizing work before/after the terminal operations process start/ends and can be considered “active”. So preparation will always “start” before the terminal operations “start” and the closing will always “end” after terminal operations “end” because are activities that needs to be done before and after the terminal operations.

Considerations per Carrier type:

Vessel:

  • carriervisit.terminaloperations.preparationatarrival.start is when an assigned CHE executes the first activity related to a specific vessel visit to initiate the preparationatarrival process (to add example?)

  • carriervisit.terminaloperations.preparationatarrival.end is when the first container move is completed by an assigned CHE related to a specific vessel visit closing the preparationatarrival process and starting the cargooperations process (to add example?)

Truck:

  • carriervisit.terminaloperations.preparationatarrival.start is when an assigned CHE executes the first activity related to a specific truck visit to initiate the preparationatarrival process (to add example?)

  • carriervisit.terminaloperations.preparationatarrival.end is when the first container move is completed by an assigned CHE related to a specific truck visit closing the preparationatarrival process and starting the cargooperations process (to add example?)

Rail:

  • carriervisit.terminaloperations.preparationatarrival.start is when an assigned CHE executes the first activity related to a specific rail visit to initiate the preparationatarrival process (to add example?)

  • carriervisit.terminaloperations.preparationatarrival.end is when the first container move is completed by an assigned CHE related to a specific rail visit closing the preparationatarrival process and starting the cargooperations process (to add example?)

TIC Description

Required Information

M

CarrierVisit id

TIC Description

SUBJECT

 

carriervisit; preparationatarrival; cargooperations; lashing; closingatdeparture

 

CONCEPT

 

id, name, active, inactive, idle, working, start, end

 

Related standards

O

 

TIC Description

Related TIC 4.0 definition

O

https://tic40.atlassian.net/l/c/3RUk3VuD https://tic40.atlassian.net/l/cp/XGbCQo5T https://tic40.atlassian.net/wiki/pages/resumedraft.action?draftId=953319425 https://tic40.atlassian.net/l/cp/Ahs7JcMG

Example

M

carriervisit.terminaloperations.preparationatarrival.start.time.output.actual =2021-11-15T15:14:01.352Z

visit.terminaloperations.preparationatarrival..end.time.output.actual =2021-11-16T15:14:01.352Z

Example in the context of the grammar

M

Link to one or more operational processes

M

 

Search tags

M

Operations; cargo operations; vessel operations; truck operations; train operations; cargo operations; port operations; terminal activities; load; discharge; unload; loading; discharging.

Version / Date

M

2022.005 - 01/10/2022

Internal TIC Version

M

20220622


 Haz clic aquí para ampliar...

Created by

Edited by

Review / Approve

Published

  Francisco Blanquer Jaraiz 2021-11-157

 

 

 

  

 

 

  • Sin etiquetas