CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | Quad | GRAMMAR |
Concept name | M | Quad | GRAMMAR |
Concept type | M | status | GRAMMAR |
Also known as | O | Quad Lift, Quad Mode,4x20 Lift, 4x20 Move, Quad Move | TIC Description |
Definition | M | Operational mode to perform four payloads (containers) in one cycle with two spreaders in Twin Mode, each spreader is connected to two containers. Typically both containers are 20ft long and positioned in such a way that the short sides of the containers are facing each other. | TIC Description |
Further Detail | O | NOTE: The Quad status is derived on crane level by looking at the Tandem status in combination with the Twin mode status. | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT |
| #Spreader, #Cycle |
|
POINT OF MEASUREMENT |
| #input;#internal_in ; #internal_out ;#output #schedule; #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #status; #counter; #duration; #timer; #totaltimer; |
|
Value |
| TRUE; FALSE; boolean |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | TIC Description | |
Example | M | che__spreader_Tandem_status := TRUE; The spreader is now operating in tandem mode che__spreader(s)_Twin_status := TRUE; The spreader is now operating in twin mode che__spreader(s)_Twin_status && che__spreader_Tandem_status := TRUE; The crane is now operating in Quad mode | TIC Description |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #Quad; | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
M = Mandatory
O = Optional
JSON:
XML:
MQTT:
Created by | Edited by | Review / Approve | Published |