Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

readytodeliver

GRAMMAR

Concept name

M

Ready To Deliver

GRAMMAR

Concept type

M

action

GRAMMAR

Also known as

O

At POW with cargo, at row with cargo, under RTG with cargo, waiting for equipment with cargo, At Yard to Deliver (AYTD), At Vessel to Deliver (AVTD)

TIC Description

Definition

M

Within the order of moving a cargo, time spent in the destination position of the container, waiting till the container is ready to be droppedConcept (status) that describes the action that is going to be performed by the subject (CHE) to execute an order (action type cargo), at the “laden” end location (end position of the cargo) to drop the cargo. It starts when the subject (CHE) arrives at the end location of the cargo and ends when the cycle ends the laden phase (the cargo is delivered or dropped). Usually, this action is related to the unlocking activities (hoist down and spreader unlocking).

TIC Description

Further Detail

O

This stage starts when the che arrives at the destination of the container, and ends when the container is drop or unloaded.

  • STS Load:  If the STS do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the container position is locked, or whatever reason, this time will be input here.

  • STS Discharge: If the STS do not stop to release the container this time can be avoided. If need to wait for the Truck to arrive, or cannot enter in the transfer zone or plaform, this time will be input here.

  • TT Load: Time while the truck is waiting in the QC queue or lane, till the container unloaded from the truck.

  • TT Discharge: Time while the truck arrives to the yard position to deliver the container, till the container is unloaded from the platform.

  • RTG: If the RTG do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the truck is not there, the transfer zone is used, or whatever reason, this time will be input here.

  • Strad: If the Strad do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the transfer zone is used, the position is not available, the truck did not arriverd or whatever reason, this time will be input here

    The start of Ready To Deliver is the end of the Moving To Deliver or Queuing To Deliver activities and the end is just when the cargo is unlocked the first time.

    Specific cases, from the equipment point of view:

    • STS Load: The Ship-to-shore spreader stays (CHE not driving or trolleying) with cargo (locked spreader) at the location where it has to drop the cargo, which is usually the carrier bay and row. Usually, the CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same STS) like for multi-trolley operations the drop location could be the pinning/interchange platform and the transfer zone (it depends on the subject). So we recommend defining the subject by trolley and not by CHE.

    • STS Discharge: The Ship-to-shore spreader stays (CHE not driving or trolleying) with cargo (locked spreader) at the location where it has to drop the cargo, which is usually the transfer zone. The CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same STS) like for multi-trolley operations the drop location could be the pinning/interchange platform and the transfer zone (it depends on the subject).

    • TT/AGV: The Terminal Tractor or AGV platform stays (idle or working) with cargo (slot locked) within the transfer area, after the Moving To Deliver or Queuing To Deliver activities. Usually, the TT needs to do the alignment and the idling to facilitate the operation until the container is placed or lifted from the platform.

    • RTG/RMG/ARMG/ASC: The gantry crane spreader stays (idle or working) with cargo (locked) within the transfer area or cargo location, after the Moving To Deliver or Queuing To Deliver activities. This area is always over the cargo or carrier slots where the cargo should be dropped (unlocked).

    • SC/SHC: The Strad or Shuttle Carrier spreader stays (idle or working) with cargo (locked) within the cargo location where it has to be dropped off (unlocked).

    TIC Description

    Required Information

    M

    SUBJECT; OBSERVED PROPERTY and VALUE

    TIC Description

    SUBJECT

    M

    order; che,

    GRAMMAR

    POINT OF MEASUREMENT

    O

    pom: output

    pomt: actual, estimated

    GRAMMAR

    OBSERVED PROPERTY

    M

    status, duration, counter, totalcounter, timer, totaltimer, starttimestamp, distanceendtimestamp

    GRAMMAR

    Value

    M

    boolean

    GRAMMAR

    Related standards

    O

    TIC Description

    Related TIC 4.0 definition

    O

    https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0Moving To Collect Queuing To Collect Ready to Collect Collect Deliver Moving To Deliver Queuing to Deliver Ready to Deliver

    TIC Description

    Example

    M

    A message from the TOS which confirms the job-step status of the terminal truck 01 from the perspective of the order, che and driver:

    tos.@.jobinstruction.@.order.@2343.movingtocollect.status.output.actual.value: FALSE.

    tos.@.jobinstruction.@.order.@2343.queuingtocollect.status.output.actual.value: FALSE

    tos.@.jobinstruction.@.order.@2343.readytocollect.status.output.actual.value: FALSE

    tos.@.jobinstruction.@.order.@2343.movingtodeliver.status.output.actual.value: FALSE

    tos.@.jobinstruction.@.order.@2343.queuingtodeliver.status.output.actual.value: FALSE

    tos.@.jobinstruction.@.oder.@2343.readytodeliver.status.output.actual.value: TRUE

    tos.@.jobinstruction.@.order.@2343.che.output.actual.id: TT01

     

    Optionally the information could be duplicated under the “che” subject. If there are a lot of elements in the che array and subsequently in the same message then it is recomended to use the array identification after the “id”

    tos.@.che.@TT01.movingtocollect.status.output.actual.value: FALSE

    tos.@.che.@TT01.queuingtocollect.status.output.actual.value: FALSE

    tos.@.che.@TT01.readytocollect.status.output.actual.value: FALSE

    tos.@.che.@TT01.movingtodeliver.status.output.actual.value: FALSE

    tos.@.che.@TT01.queuingtodeliver.status.output.actual.value: FALSE

    tos.@.che.@TT01.readytodeliver.status.output.actual.value: TRUE

    TIC Description

    Example in the context of the grammar

    M

    Image Added

    TIC Description

    Link to one or more operational processes

    M

    All the jobinstructions type cargo move.

    https://tic40.atlassian.net/l/cp/4Q1bj1tt https://tic40.atlassian.net/l/cp/hLw2PTh0

    TIC Description

    Search tags

    M

    laden #laden at row, #wait, #waiting

    Technical

    Version / Date

    M

    2023.007 - 25/0302/2023

    Technical

    Internal TIC Version

    M

    2023021620230227

    Technical

    M = Mandatory

    O = Optional

    Introduction to concept type “job-stepping”:

    The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity the CHE is doing to move the cargo. There are 6 basic sub processes to perform a move:

    • Moving to Collect

    • Queuing to Collect

    • Ready to Collect

    • Moving to Deliver

    • Queuing to Deliver

    • Ready to Deliver

    All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.

    ...

    TT order job stepping for Vessel load - 4 job steps example

    ...

    TT order job stepping for Vessel discharge- 6 job steps example, geofence available

    The https://tic40.atlassian.net/l/cp/S8dYAjXu (instruction to execute a sequence of steps) is the natural subject of the job-stepping, so we will include by default the concepts for each step under “order” but these concepts can be used with other subjects like CHE, user, cargo, etc.

    ...

    View file
    nameTIC40 DATA Model 2023.0073 Assigned.txt
    View file
    nameTIC40 DATA Model 2023.0073 Assigned.json

    ...

    Created by

    Edited by

    Review / Approve

    Published

     Francisco Blanquer Jaraiz 2023-02-16 

      Francisco Blanquer Jaraiz 2023-02-27