CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | off | GRAMMAR |
Concept name | M | Off | GRAMMAR |
Concept type | M | status | GRAMMAR |
Also known as | O | Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off; turned off; Out of operations; idle; not running; | TIC Description |
Definition | M | If the main power supply and all subject systems are not ready to operate (do the job it has been designed for) the subject in less than 2 seconds or requires more than one operation action (a sequence) then TRUE else FALSE | TIC Description |
Further Detail | O | This definition is complementary to the “On” concept. If “On” is TRUE then “Off” is FALSE and vice-versa. If the power subject system is not able to supply the energy for normal operation or the “control” of the subject is “off” or any of the subject systems or subsystems is not ready to run the subject for its normal “job” in less than 2 seconds (default standby_to_operative_timer = 2) or it is required an operator sequence actions then it is considered off. If you are moving from On to Off and you can not stop the process to return to On in less than 2 (default standby_to_operative_timer = 2) seconds then you are Off. | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | M | #CHE; #Gate; #Terminal; #TOS ; #Luminary | GRAMMAR |
POINT OF MEASUREMENT | O | #input;#internal_in ; #internal_out ;#output #schedule; #planning; #estimated; #actual; #performed | GRAMMAR |
OBSERVED PROPERTY | M | #status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter standby_to_operative_timer = 2 (default) | GRAMMAR |
Value | M | TRUE; FALSE; integer; real number; | GRAMMAR |
Related standards | O | N/A | TIC Description |
Related TIC 4.0 definition | O | #on; #on_standby | TIC Description |
Example | M | che_.off_.status: TRUE = the Container Handler Equipment is not ready to operate or do its job properly in less than 2 seconds because no power, no control or any of its systems is not able to be ready on time. (E.g an RTG crane diesel engine is running, but the variable frequency drives are not switched on so an action and/or more than 2 seconds are needed to start and activity and move to on/on_standby onstandby status.) che_.spreader_.off_.status: FALSE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 seconds. che_.engine_.off_.status: TRUE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 seconds. TOS_.off_.status: TRUE = the complete system is not running and does not allow users or machines to login. | TIC Description |
Example in the context of the grammar | M | An RTG with the Engine On but the drivers off and the control off che_.engine_.off_.status: FALSE; che_.drivers_.off_.status: TRUE; che_.control_.off_.status: TRUE; che_.off_.status: TRUE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4Q1_2020 2021 / 1530.0904.20202021 | Technical |
Internal TIC Version | M | definition technical group | Technical |
...