TIC 4.0

TIC4.0 Terminal Example 2021.002

To create a better understanding of the TIC4.0 semantics, we are using a very simple container terminal example as a reference. This will make sure, that everybody has the same business and business process in mind and can refer to the same examples when discussing the definitions and semantics. Complexity in any direction can be added to make sure the definitions fit for more detailed questions, for the high-level view and for similar operational situations or equipment being used.

General description

Our TIC4.0 Terminal is a typical TT → RMG terminal. It has a small quay with one berth and only one ship-to-shore crane (STS-1) with a twin spreader. The terminal operates with terminal tractors for the horizontal transport. It stacks the container with RMGs. It has two terminal tractors (TT-1 and TT-2) and one RMG (RMG-1). The RMG is also being used to interchange containers with trucks.

 

At the beginning of the first week, there are only 2 containers kept in the yard: BOX-1 and BOX-2

Once per week the terminal gets a vessel visit. The vessel name is CLARA. During the first vessel visit, BOX-3 is discharged from the vessel. Once per week one truck is coming (named MAX). The truck MAX is picking up BOX-1.

Let's first have a look, what is happening and when:

Week 1

  • Monday 9 AM: No vessel. no equipment is moving = no operation. Boxes in the yard = 2

  • Monday 12 PM: Vessel CLARA is mooring - the first line is secured. No operation. Boxes in the yard=2.

  • Monday 3 PM: Vessel CLARA mooring is completed. The vessel is ready to be worked on. STS-1 has moved to the right place to begin the loading and discharging. But nothing more will happen today.

  • Tuesday 9 AM: Vessel CLARA is ready to work. The terminal is ready to work. No operation. Boxes in the yard=2.

  • Tuesday 12:00 PM: STS-1 is discharging (in progress) BOX-3 from vessel CLARA. TT-1 is already in the right location to receive BOX-3.

  • Tuesday 12:10 PM: RMG-1 is discharging BOX-3 from TT-1 (discharging CLARA and loading TIC!Yard).

  • Tuesday 13:00 PM: RMG-1 hast just finished to load MAX (discharging TIC!Yard) with BOX-1

  • Tuesday 13:10 PM: MAX leaves the terminal with BOX-1

High-Level application of TIC4.0 Semantic

SUBJECTs names

  • Terminal: TIC!Terminal

  • Area: TIC!Yard

  • Berth: TIC!Berth-1

  • CHE Ship-to-shore crane: TIC!-STS-1

    • Spreader

  • CHE Rail-mounted gantry crane: TIC!-RMG-1

  • CHE Terminal tractors: TIC!-TT-1, TIC!-TT-2

  • Service: FARAWAY

  • Servicevisit (Service FARAWAY Monday to Wednesday) = servicevisit.id= FARAWAY-TIC!Terminal-Mo-We

  • Carrier (Vessel): CLARA

  • Carriervisit (Vessel visit W1: CLARA Monday to Wednesday) = carriervisit.id = CLARA-TIC!Terminal-Mo-We-W1

  • Carrier (Trucks): MAX, MORITZ

  • Cycle : each discrete process designed to execute a job (usually move cargo) has an specific id but not name.

  • Cargo : for this example all cargo are containers.

CONCEPTs

The following concepts are required to describe the processes with a very high - level view:

  • ID

  • On

  • Off

  • Size

  • Location

  • Arrival.berthing.start (firstline)

  • Carriersafetyaccessible

  • Carrierreadytowork

  • Terminalreadytowork

  • Drive

  • Locked

  • Unlocked

  • Move

  • Laden

OBSERVED PROPERTies

  • Time

  • Status

  • Counter

  • Timer

  • Logical (location.logical)

  • Move (cycle.move)

  • Laden (cycle.laden)

  • Start

  • End

POINT OF MEASUREMENT (PoM)

  • pom : output (result, confirmation)

  • pomt (time) : Actual (realtime)

  • pomp (process) : started (process initiated but not necessarily completed); ended (process completed)

Value

  • Value

  • Binary

  • TEU

  • Box

Application of TIC4.0 Semantic to process description

Week 1

Timestamp = Monday 09:00:00

No vessel. no equipment is moving = no operation. Boxes in the yard = 2

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-2

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-2

(che)

Off

Status

Output; Actual;

True

 

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

Timestamp = Monday 12:00:00

Vessel CLARA is mooring - the first line is secured. No operation. Boxes in the yard=2. No activity in the terminal.

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-2

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-2

(che)

Off

Status

Output; Actual;

True

 

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

CLARA-TIC!-Mo-We-W1

(carriervisit)

Location

logical

Output; Actual;

TIC!-Berth1

 

CLARA

(carrier)

Location

logical

Output; Actual;

TIC!-Berth1

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1 (carriervisit.arrival)

active

status

Output; Actual;

true

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1 (carriervisit.arrival)

start

time

Output; Actual;

12:00:00

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

carriersafetyaccesible

Status

Output; Actual;

False

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

carrierreadytowork

Status

Output; Actual;

False

 

Timestamp = Monday 15:00:00

Vessel CLARA mooring is completed. The vessel is ready to be worked on. STS-1 has moved to the right place to begin the loading and discharging. But nothing more will happen today - it is close of business, the terminal is not ready to work.

While moving STS-1 to the right place - Status at 14:40 (Instant message 2020-01-02 14:40:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

True

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Location

Logical

Output; Actual;

TIC!-Berth

-Bolard2

 

TIC!-STS-1

(che)

Drive

Status

Output; Actual;

True

 

After moving STS-1 to the right place - Closed message (agregated information) from 14:00:00 to 15:00:00 and created at 15:00:00

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

(hh:mm:ss)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

(hh:mm:ss)

 

TIC!-STS-1

(che)

On

Timer

Output; Actual;

00:20:00

 

TIC!-STS-1

(che)

Off

Timer

Output; Actual;

00:40:00

 

TIC!-STS-1

(che)

Drive

Timer

Output; Actual;

00:15:00

 

TIC!-STS-1_Spreader

(che.spreader)

Unlocked

Timer

Output; Actual;

00:60:00

 

TIC!-STS-1_Spreader

(che.spreader)

Locked

Timer

Output; Actual;

00:00:00

 

TIC!-STS-1_Spreader

(che.spreader)

Locked

Counter

Output; Actual;

0

 

Timestamp = Monday at 15:05:00

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-1

(che)

Off

Status

Output; Actual;

True

 

TIC!-TT-2

(che)

On

Status

Output; Actual;

False

 

TIC!-TT-2

(che)

Off

Status

Output; Actual;

True

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

Vessel visit process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

carrierreadytowork

Status

Output; Actual;

True

 

Vessel visit process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

terminalreadytowork

Status

Output; Actual;

False

 

 

Timestamp = Tuesday 09:00:00

Vessel CLARA is ready to work. The terminal is ready to work. No operation. Boxes in the yard=2.

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

True

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

False

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit.arrival.mooring)

active

status

Output; Actual;

False

 

berthing process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit.arrival.mooring)

lastline

status

Output; Actual;

True

 

Vessel visit process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

carrierreadytowork

Status

Output; Actual;

True

 

Vessel visit process of CLARA-TIC!Terminal-Mo-We-W1

(carriervisit)

terminalreadytowork

Status

Output; Actual;

True

 

Timestamp = Tuesday 12:00:00 PM: STS-1 is discharging (in progress) BOX-3 from vessel CLARA. TT-1 is already in the right location to receive BOX-3.

Status at 12:00:00 (Instant message Tuesday 12:00:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

True

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Location

Logical

Output; Actual;

TIC!-Berth

-Bolard2

 

TIC!-STS-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-STS-Spreader

(che.spreader)

Locked

Status

Output; Actual;

True

 

TIC!-STS-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

False

 

TIC!-TT-1

(che)

On

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

Location

logical

Output; Actual;

TIC!-Berth1-Bolard2

 

TIC!-TT-1 TT executing a “move”

(che.cycle)

active

status

Output; Actual;

True

 

TIC!-TT-1 TT executing a “move” with cargo

(che.cycle.laden)

active

status

Output; Actual;

True

 

TIC!-STS-1

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-3-ISO 6346

 

TIC!-STS-1

(che.cycle.laden)

Start

time

Output; Actual;

11:59:00

 

TIC!-STS-1

(che.cycle.end)

End

time

Output; Actual;

 

 

CLARA

(carrier.cycle)

End

time

Output; Actual;

11:59:00

 

While STS-1 is moving the container from the Vessel to the Terminal Tractor we create a Closed (aggregated) message from 11:50:00 to 12:00:00 (represent the last 10 minutes process)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

timer

Output; Actual;

00:10:00

 

TIC!-STS-1

(che)

Off

timer

Output; Actual;

00:00:00

 

TIC!-STS-1

(che)

Drive

Timer

Output; Actual;

00:00:00

 

TIC!-STS-1_Spreader

(che.spreader)

Unlocked

Timer

Output; Actual;

00:09:00

 

TIC!-STS-1_Spreader

(che.spreader)

Locked

Timer

Output; Actual;

00:01:00

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

0

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

0

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

0

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

0

 

Timestamp = Tuesday 12:01:00

STS-1 has “just” unlocked the spreader and left the container BOX-3 on the TT-1 from vessel CLARA. TT-1 now is loaded with a the container BOX-3.

Status at 12:01:00 (Instant message Tuesday 12:01:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

Status

Output; Actual;

True

 

TIC!-STS-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-STS-1

(che)

Location

Logical

Output; Actual;

TIC!-Berth

-Bolard2

 

TIC!-STS-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-STS-Spreader

(che.spreader)

Locked

Status

Output; Actual;

False

 

TIC!-STS-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

True

 

TIC!-TT-1 is running under the crane

(che.on)

On

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

Location

logical

Output; Actual;

TIC!-Berth1-Bolard2

 

TIC!-TT-1 TT executing the next “move”

(che.cycle)

active

status

Output; Actual;

True

 

TIC!-TT-1 TT executing a “move” with cargo

(che.cycle.laden)

active

status

Output; Actual;

True

 

TIC!-TT-1 TT holds Box-3

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-3-ISO 6346

 

TIC!-STS-1

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-3-ISO 6346

 

CLARA

(carrier.cycle.end)

End

time

Output; Actual;

11:59:00

 

TIC!-STS-1

(che.cycle.laden)

Start

time

Output; Actual;

11:59:00

 

TIC!-STS-1

(che.cycle.end)

End

time

Output; Actual;

12:01:00

 

TIC!-TT-1

(che.cycle.laden)

Start

time

Output; Actual;

12:01:00

 

TIC!-TT-1

(che.cycle.end)

End

time

Output; Actual;

 

 

While STS-1 is moving the container from the Vessel to the Terminal Tractor we create a Closed (aggregated) message from 11:50:00 to 12:01:00 (represent the last 11 minutes process)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-STS-1

(che)

On

timer

Output; Actual;

00:11:00

 

TIC!-STS-1

(che)

Off

timer

Output; Actual;

00:00:00

 

TIC!-STS-1

(che)

Drive

Timer

Output; Actual;

00:00:00

 

TIC!-STS-1_Spreader

(che.spreader)

Unlocked

Timer

Output; Actual;

00:09:00

 

TIC!-STS-1_Spreader

(che.spreader)

Locked

Timer

Output; Actual;

00:01:59

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

0

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

0

 

Timestamp = Tuesday 12:10:00

RMG-1 has “just” locked and lift the spreader with the BOX-3 of TT-1 from vessel CLARA.

Status at 12:10:00 (Instant message Tuesday 12:10:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Location

Logical

Output; Actual;

TIC!Yard-B01

 

TIC!-RMG-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Locked

Status

Output; Actual;

True

 

TIC!-RMG-1-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

False

 

TIC!-TT-1 is running under the RMG

(che.on)

On

Status

Output; Actual;

True

 

TIC!-TT-1

(che)

Location

logical

Output; Actual;

TIC!Yard-B01

 

TIC!-TT-1 TT executing the next “move”

(che.cycle)

on

status

Output; Actual;

True

 

TIC!-TT-1 TT executing a “move” with cargo

(che.cycle.laden)

on

status

Output; Actual;

False

 

TIC!-TT-1 TT holds a cargo

(che.cycle.cargo)

id

“metadata”

Output; Actual;

 

 

TIC!-RMG-1 moving a cargo

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-3-ISO 6346

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

While RMG-1 is moving the container from the TT-1 to the Terminal Yard we create a Closed (aggregated) message from 11:50:00 to 12:10:00 (represent the last 20 minutes process)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Ended

0

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

0

 

Timestamp = Tuesday 12:12:00

RMG-1 has “just” unlocked and left BOX-3 of TT-1 from vessel CLARA into the yard

Status at 12:12:00 (Instant message Tuesday 12:12:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Location

Logical

Output; Actual;

TIC!Yard-B01

 

TIC!-RMG-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Locked

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

True

 

TIC!-RMG-1 moving a cargo

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-3-ISO 6346

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

3

 

While RMG-1 unlock the Box-3 that discharge from the TT-1 to load the Terminal Yard we create a Closed (aggregated) message from 11:50:00 to 12:12:00 (represent the last 22 minutes process)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

0

Timestamp = Tuesday 13:00:00

RMG-1 has “just” unlocked and left BOX-1 from the yard on the Truck MAX

Status at 13:00:00 (Instant message Tuesday 13:00:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Location

Logical

Output; Actual;

TIC!Yard-B01

 

TIC!-RMG-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Locked

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

True

 

TIC!-RMG-1 moving a cargo

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-1-ISO 6346

 

MAX

(carrier.cycle.laden)

on

Status

Output; Actual;

True

 

MAX

(carrier)

location

logical

Output; Actual;

TIC!Yard-B01

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

Just when RMG-1 unlock the Box-1 that discharge from the yard to load the MAX truck we create a Closed (aggregated) message from 11:50:00 to 13:00:00

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Started

2

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Ended

2

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

0

 

Timestamp = Tuesday 13:10:00

Truck MAX has “just” passed through the gate (out) with the BOX-1

Status at 13:10:00 (Instant message Tuesday 13:10:00)

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

TIC!-RMG-1

(che)

On

Status

Output; Actual;

True

 

TIC!-RMG-1

(che)

Off

Status

Output; Actual;

False

 

TIC!-RMG-1

(che)

Location

Logical

Output; Actual;

TIC!Yard-B01

 

TIC!-RMG-1

(che)

Drive

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Locked

Status

Output; Actual;

False

 

TIC!-RMG-1-Spreader

(che.spreader)

Unlocked

Status

Output; Actual;

True

 

TIC!-RMG-1 moving a cargo

(che.cycle.cargo)

id

“metadata”

Output; Actual;

BOX-1-ISO 6346

 

MAX

(carrier.cycle.laden)

on

Status

Output; Actual;

True

 

MAX

(carrier)

location

logical

Output; Actual;

TIC!Gate-G01

Cargo sum at TIC!-Yard

(tos.cargo)

(filter by location.logical=TIC!-yard)

size

box

Output; Actual;

2

 

The moment MAX crossed the gate with the Box-1 we create a Closed (aggregated) message from 11:50:00 to 13:10:00

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

SUBJECT

CONCEPT

OBSERVED PROPERTY

pom;

pomt;

pomp;

Value

 

CLARA

(carrier.cycle)

Move

Box

Output; Actual; Ended

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-STS-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Started

1

 

TIC!-TT-1

(che.cycle)

Move

Box

Actual; Input; Ended

1

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Started

2

 

TIC!-RMG-1

(che.cycle)

Move

Box

Actual; Input; Ended

2

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Started;

1

TIC!Terminal “moves”

(terminal.cycle)

Move

Box

Output; Actual; Ended;

1

 

Summary

Between 11:50:00 and 13:10:00 the TIC!Terminal has performed very well:

  • STS-1 has moved 1 box,

  • TT-1 also has moved 1 Box

  • RMG-1 has moved 2 Boxes

but the TIC!Terminal only could finish 1 box! Well, TIC!Terminal has started 1 box and ended 1 box (sum terminal.cycle.move.box.started_and_ended = 2 Boxes). To achieve this result it had to make 4 che.cycles, moving a total of 4 boxes (sum of che.cycle.move.box).

  • Terminal berth has moved 1 box

  • Terminal gate has moved 1 box

  • TIC!Terminal has moved 1 box

This efficiency is not so bad, just to move 1 box! If you need to know anything about TIC40!Terminal you just have to combine any of the thousands values that defines your terminal virtual objects to get any information.

 

 

To be continued…. (TOS example pending)

 

© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport