TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 17 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

on

GRAMMAR

Concept name

M

On

GRAMMAR

Concept type

M

Activity

GRAMMAR

Also known as

O

On; Not Off; Power On; Ready to work; standby; With power; Engine on; Power supply on; running;

TIC Description

Definition

M

If the main power supply and all subject systems are ready to operate (do the job it has been designed for) the subject in less than 2 seconds with maximum of one operation action then TRUE else FALSE

TIC Description

Further Detail

O

This definition is complementary to the “Off” concept.

If the power subject system is able to supply the energy for normal operation and the “control” of the subject is “on” and all the subject systems and subsystems are ready to run the subject for its normal “job” in less than 2 seconds (default standby_to_operative_timer = 2) (included in the 2 seconds just one human action intervention) then it is considered “on”. If all of the critical components to operate are “on” then is considered “on”.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

 

#CHE; #Gate; #Terminal; #TOS ; #Luminary; #Engine

 

POINT OF MEASUREMENT

 

#input;#internal_in ; #internal_out ;#output

#schedule; #planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter; #distance; default standby_to_operative_timer = 2 (default)

 

Value

 

TRUE; FALSE; real number; integer

 

Related standards

O

 All related with the safety process to start a Machine.

TIC Description

Related TIC 4.0 definition

O

#off; #on_standby

TIC Description

Example

M

che_on_status: TRUE = the Container Handler Equipment is ready to operate or do its job properly in less than 2 seconds because the power, the control and all of its systems are able to be ready on time and only needs one operation actions to get it.

che_spreader_on_status: TRUE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 seconds.

che_engine_on_status: FALSE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 seconds.

TIC Description

Example in the context of the grammar

M

An RTG with the Engine On but the electrical drivers (inverters) are off and the control off and both has to be armed by the operator.

che_engine_on_status: TRUE; che_drivers_on_status: FALSE; che_control_on_status: FALSE; che_on_status: FALSE

CHE with the operator seated, engine standby (start-stop system), CHE ready to operate just when driver move the joystick then ON

che_engine_on_status: FALSE; che_control_on_status: TRUE; che_seat_operator_on_status: TRUE; che_on_status: TRUE; che_on_standby_status: TRUE

CHE with the operator not seated, engine standby (start-stop system), CHE ready to operate just when driver seated and move the joystick then OFF

che_engine_on_status: FALSE; che_control_on_status: TRUE; che_seat_operator_on_status: FALSE; che_on_status: FALSE; che_on_standby_status: FALSE

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

M

#OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working

Technical

Version / Date

M

TIC_Q4_2020 / 15.09.2020

Technical

Internal TIC Version

M

definition technical group

Technical

M = Mandatory

O = Optional


JSON:

XML:

MQTT:

Created by

Edited by

Review / Approve

Published

  • Sin etiquetas