TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 7 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

off

GRAMMAR

Concept name

M

Off

GRAMMAR

Concept type

M

status

GRAMMAR

Subject Tag

M

#CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL

GRAMMAR

Also known as

O

Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off; turned off; Out of operations; idle; not running;

TIC Description

Definition

M

If the main power supply or any system of the subject is not ready to operate (do the job it has been designed for) the subject in less than 2 seconds then TRUE else FALSE

TIC Description

Further Detail

O

This definition is complementary to “on” concept.

If the machine is not able to supply the energy for normal operation or the “control” of the subject is “off” or any of the subject systems or subsystems is not ready to run the subject for its normal “job” in less than 2 seconds then it is considered off. If any of the critical components to operate are not “on” then is considered “off”.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

#CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate; #Terminal; #MC; #TOS ; #Luminary

POINT OF MEASUREMENT

#input;#internal_in ; #internal_out ;#output

#schedule; #planning; #estimated; #actual; #performed

OBSERVED PROPERTY

#status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter

Value

TRUE; FALSE; integer; real number;

Related standards

O

TIC Description

Related TIC 4.0 definition

O

#on; #on_standby

TIC Description

Example

M

che_off_status: TRUE = the Container Handler Equipment is not ready to operate or do its job properly in less than 2 seconds because no power, no control or any of its systems is not able to be ready on time.

che_spreader_off_status: FALSE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 seconds.

che_engine_off_status: TRUE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 seconds.

TIC Description

Example in the context of the grammar

M

An RTG with the Engine On but the drivers off and the control off

che_engine_off_status: FALSE; che_drivers_off_status: TRUE; che_control_off_status: TRUE; che_off_status: TRUE

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

M

#OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working

Technical

Version / Date

M

TIC_Q4_2020 / 15.09.2020

Technical

Internal TIC Version

M

definition technical group

Technical

M = Mandatory

O = Optional


OLD PROPOSAL

CONCEPT

ID

36

Name

CHE Activity Off

Abbreviation

che.activity.off.command||request||feedback||action.status||counter||timer||energy||distance

Category

(optional) Tag (Activity, Move, Functional, Operational, OS, etc) groups at a high level the property concept and establish a hierarchy. It is a tag that helps to identify and describe the property. The objective helps the human to classify, find, use the properties. Ie: move; activity; functional, operational, control, TOS. One concept can have several families but must be a closed list.

Also known as

Engine off; power supply off

Definition

If main power supply is available to operate in less than 2 seconds then false else true

Further Detail

If the machine is able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is not main power supply running (ie CHE_Activity_On_Standby : true

This definition is complementary to CHE_Activity_On_Standby

Required

Related standards

Related TIC 4.0 definition

HEADER

Identifies the message in origin, destination, time and unique reference (use this link for more information)

Mandatory

Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end

Optional

(Header topic; Header identifier)

SUBJECT

Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information)

Default

Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable)

Suitable

Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples)

POINT OF MEASUREMENT

It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information)

Default

IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified)

Optional

Control (from where)

OBSERVED PROPERTY

It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information)

Default

Status; %; Speed; Counter; Distance; Timer; Energy; Average; …

Suitable

Specify units when they are different than the International System

Units

True/False

Draws

(optional) add some draws to explain the concept

Diagrams

(optional) add some process diagram which concept belongs

Attached documents

(optional) add some document to explain the concept

Examples

Human

1.20191205 12:00 London-Gate03 move “get_in” “out=result” actual boxes “1

2.20191205 12:06 London-TZ01 move “occupied” in actual boxes “1

3.20191205 12:18 London-SC74 move “in” actual boxes “1” (waiting for orders)

4.20191205 12:22 London-SC74 move “Lock” actual boxes “1

5.20191205 12:22 London-TZ01 move out actual boxes “1

6.20191205 12:32 London-Yard_A-34B56 move “occupied” in actual boxes “1

JSON:

XML:

MQTT:

Created by

Edited by

Review / Approve

Published

  • Sin etiquetas