TIC 4.0

Quad

CONCEPT

Fields

Type

Description

Purpose

Fields

Type

Description

Purpose

ID (Concept identifier)

M

quad

GRAMMAR

Concept name

M

Quad

GRAMMAR

Concept type

M

status

GRAMMAR

Also known as

O

Quad Lift, Quad Mode,4x20 Lift, 4x20 Move, Quad Move

TIC Description

Definition

M

Operational mode to perform four payloads (containers) in one cycle with two spreaders in Twin Mode, each spreader is connected to two containers.

All four containers are 20ft long and positioned in such a way that the short sides of the containers are facing each other on each spreader.

TIC Description

Further Detail

O

NOTE: The Quad status is derived on crane level by looking at the Tandem status in combination with the Twin mode status.

Tandem can be used also as a “unit” with the observed property “counter” in the context of move.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

 

#Spreader, #Cycle

 

POINT OF MEASUREMENT

 

#input;#internal_in ; #internal_out ;#output

#schedule; #planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status; #counter; #duration; #timer; #totaltimer;

 

Value

 

TRUE; FALSE; boolean

 

Related standards

O

 

TIC Description

Related TIC 4.0 definition

O

https://tic40.atlassian.net/wiki/spaces/TIC40Definitions/pages/420643176 https://tic40.atlassian.net/wiki/spaces/TIC40Definitions/pages/420905079 https://tic40.atlassian.net/wiki/spaces/TIC40Definitions/pages/1029505025 https://tic40.atlassian.net/wiki/spaces/TIC40Definitions/pages/1034813441 https://tic40.atlassian.net/l/cp/V1UYG5iY

TIC Description

Example

M

che.@.spreader.@.tandem.status.ouput.actual.value : TRUE = The spreader is now operating in tandem mode

che.@.spreader.@.twin.status.ouput.actual.value : TRUE ; The spreader is now operating in twin mode

che.@.spreader.@.quad.status.ouput.actual.value : TRUE = The crane is now operating in Quad mode

TIC Description

Example in the context of the grammar

M

 

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

M

#Quad;

Technical

Version / Date

M

2023.007 - 25/03/2023

Technical

Internal TIC Version

M

20230309

Technical

M = Mandatory

O = Optional

 

 

Created by

Edited by

Review / Approve

Published

 

@Francisco Blanquer Jaraiz 2023-03-09 

 

 

 

 

 

 

 

© Copyright - TIC 4.0 All rights reserved | Design web by Fundación Valenciaport