TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 8 Siguiente »

_and_CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

notavailable_and_wasplanned

GRAMMAR

Concept name

M

Not available and Was Planned

GRAMMAR

Concept type

M

Status

GRAMMAR

Also known as

O

Planned

TIC Description

Definition

M

Subject is not available to be used or obtained due to a planned closure .(event notified at least 12 hours in advance)

TIC Description

Further Detail

O

This concept can be used for multiple subjects:

  1. Terminal: “not available was planned” refers to “terminal not open and not accessible” due to scheduled closures

  2. CHE: “not available was planned” means that the machine is unavailable due to a planned closure.

  3. Actor or (human) user: “not available was planned” means that the actor is unavailable due to public holidays, legal rest times, religious customs and others.

TIC Description

Required Information

M

TIC Description

SUBJECT

 

Terminal, Throughput, Performance, Berth, Yard, Gate, CHE

 

POINT OF MEASUREMENT

 

Scheduled, Actual, estimated

 

OBSERVED PROPERTY

 

status; duration; counter; totalcounter; timer; totaltimer

 

Value

 

status: boolean; duration and timer: seconds, totaltimer: hour.

 

Related standards

O

TIC Description

Related TIC 4.0 definition

O

notavailable; available_and_wasschedule; availableand_wasplanned; notavailable_and_wasschedule; notavailable_and_wasplanned;

TIC Description

Example

M

Terminal “not available and was planned”, The terminal is open and accessible.

tos|@|terminal|@|notavailable_and_wasplanned|status|output|actual|value = true

Terminal has been “not available and was planned” (closed due to scheduled closures) during the last year during a total of 14 days

tos|@|terminal|@|notavailable_and_wasplanned|status|output|actual|#unit#day|timer= 14

CHE “not available scheduled”, The CHE is not ready to receive orders due to a scheduled closure

tos|@|che|@|notavailable_and_wasplanned|status|output|actual|value = true

Position “not available and was planned”, a specific position in the yard is “not available” due to a scheduled event (for example, maintenance operations).

tos|@|position |@|notavailable_and_wasplanned|status|output|actual|value = true

TIC Description

Example in the context of the grammar

M

See below

TIC Description

Link to one or more operational processes

M

terminal closed planned, terminal planned, holidays

TIC Description

Search tags

M

20241029

Technical

Version / Date

M

R0.1

Technical

Internal TIC Version

M

terminalclosedscheduled

Technical

M = Mandatory

O = Optional


  • Sin etiquetas