TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 3 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

wasplanned

GRAMMAR

Concept name

M

Was Planned

GRAMMAR

Concept type

M

Status

GRAMMAR

Also known as

O

Planned

TIC Description

Definition

M

This status indicates that the subject concept was intended by all the actors to be or do an action/status (concept) in the future in a specific and detailed way and time.

TIC Description

Further Detail

O

This concept can be used for multiple subjects:

  1. Terminal: “not available and was planned” refers to “terminal not open and not accessible” due to planned closures

  2. CHE: In the context of maintenance, a "planned repair" over a CHE which is not part of regular maintenance.

  3. Actor or (human): A technician who receives an order to perform a "planned repair" on a CHE.

TIC Description

Required Information

M

TIC Description

SUBJECT

 

Terminal, Berth, Yard, Gate, CHE, Actor

 

POINT OF MEASUREMENT

 

Planned

 

OBSERVED PROPERTY

 

status; duration; counter; totalcounter; timer; totaltimer

 

Value

 

status: boolean; duration and timer: seconds, totaltimer: hour.

 

Related standards

O

TIC Description

Related TIC 4.0 definition

O

notavailable; available_and_wasschedule; availableand_wasplanned; notavailable_and_wasschedule; notavailable_and_wasplanned;

TIC Description

Example

M

  • Terminal “not available was planned”, the terminal is not open and not accessible

    • tos|@|terminal|@|notavailable_and_wasplanned|status|output|actual|value = true

  • The Terminal has been “not available was planned” (closed due to scheduled closures) during the last year for a total of 14 days

    • tos|@|terminal|@|notavailable_and_wasplanned|status|output|actual|#unit#day|timer= 14

  • A technitian has dedicated 20 hours to performed planned inspections during the las year

    • AMS|@|actor|@|task|@|inspecting|status|planned|totalcounter = 20

TIC Description

Example in the context of the grammar

M

imagen-20241114-180940.png

TIC Description

Link to one or more operational processes

M

terminal closed planned, terminal planned, Inspecting , Diagnosing , Repairing

TIC Description

Search tags

M

20241029

Technical

Version / Date

M

R0.1

Technical

Internal TIC Version

M

planned

Technical

M = Mandatory

O = Optional


  • Sin etiquetas