CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | planned | GRAMMAR |
Concept name | M | Planned | GRAMMAR |
Concept type | M | Status | GRAMMAR |
Also known as | O | Planned | TIC Description |
Definition | M | This status indicates that the subject concept was intended by all the actors to be or do an action/status (concept) in the future in a specific and detailed way and time. | TIC Description |
Further Detail | O | This concept can be used for multiple subjects:
| TIC Description |
Required Information | M | TIC Description | |
SUBJECT |
| Terminal, Berth, Yard, Gate, CHE, Actor |
|
POINT OF MEASUREMENT |
| Planned |
|
OBSERVED PROPERTY |
| status; duration; counter; totalcounter; timer; totaltimer |
|
Value |
| status: boolean; duration and timer: seconds, totaltimer: hour. |
|
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | notavailable; availableschedule; availableplanned; notavailableschedule; notavailableplanned; | TIC Description |
Example | M |
| TIC Description |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M | terminal closed planned, terminal planned, Inspecting , Diagnosing , Repairing | TIC Description |
Search tags | M | 20241029 | Technical |
Version / Date | M | R0.1 | Technical |
Internal TIC Version | M | planned | Technical |
M = Mandatory
O = Optional