CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | movingtodeliver | GRAMMAR |
Concept name | M | Moving To Deliver | GRAMMAR |
Concept type | M | action | GRAMMAR |
Also known as | O | TIC Description | |
Definition | M | Concept (status) that describes the action to move (displace) and/or trolleying (positioning the spreader) made by the subject (CHE) laden (locked) that performing an order type cargo from the “laden” start location (X,Y origin position of the cargo, not included Z) to the Waiting To Deliver area or Ready To Deliver transfer zone. | TIC Description |
Further Detail | O | Moving To Deliver is true between the cargo is locked by the subject and the moment the subject reaches the geofence area for queuing or the cycle laden end location (the end position of the cargo for the cycle process included in the order, usually called drop location). The “drive” and “trolleying” are included in this definition. In general, the areas for the transfer zones and the queuing zone are defined by the terminal. Specific cases:
| TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | M | order; che, | GRAMMAR |
POINT OF MEASUREMENT | O | pom: output pomt: actual, estimated | GRAMMAR |
OBSERVED PROPERTY | M | status, duration, timer, distance | GRAMMAR |
Value | M | GRAMMAR | |
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O |
| TIC Description |
Example | M | TIC Description | |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M | TIC Description | |
Search tags | M | carry underway, laden | Technical |
Version / Date | M | 2023.007 - 25/03/2023 | Technical |
Internal TIC Version | M | 20230216 | Technical |
M = Mandatory
O = Optional
Introduction to concept type “job-stepping”:
The concepts type job-stepping describes a status (what does or is the subject) related only to concepts (action) that “moves” cargo. The objective of this type of concept is to define what type of activity is doing the CHE to move the cargo. There are 6 basic subprocesses to perform a move:
Moving to Collect
Queuing to Collect
Ready to Collect
Moving to Deliver
Queuing to Deliver
Ready to Deliver
All the steps are optional and would depend on the order. For one specific order, only one Job-stepping concept can be “true” at the same time.
TT order job stepping for Vessel load - 4 job steps example
TT order job stepping for Vessel discharge- 6 job steps example, geofence available
The https://tic40.atlassian.net/l/cp/S8dYAjXu (instruction to execute a sequence of steps) is the natural subject of the job-stepping, so we will include by default the concepts for each step under “order” but these concepts can be used with other subjects like CHE, user, cargo, etc.
Created by | Edited by | Review / Approve | Published |
Francisco Blanquer Jaraiz 2023-02-16 |
|
|
|
|
|
| |