CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

movingtodeliver

GRAMMAR

Concept name

M

Moving To Deliver

GRAMMAR

Concept type

M

action

GRAMMAR

Also known as

O

TIC Description

Definition

M

Within the order of moving a cargo, move the equipment to the final position of the container .

TIC Description

Further Detail

O

This stage starts when the CHE picks or receives the container, and ends when the CHE arrives to the destination position of the container.

Looking at this stage from the equipment point of view, here some examples:

  • STS Load: With the container loaded, time spent in move from the berth to the bay/ row of the vessel where the container will be placed

  • STS Discharge: With the container loaded, time spent in move from the vessel position to the lane or transfer zone area.

  • TT Load: Move with the container loaded from the yard to the QC Lane/Rail transfer lane where the container will be picked.

  • TT Discharge: Move with the container loaded from QC lane or Rail transfer lane to the yard position where the container will be picked.

  • RTG: Move the RTG to the position where the container will be delivered, could be a truck Lane or a transfer zone area.

  • IYC discharge: With the container loaded, time spent in move from the wagon position to the lane/transfer area/block position where the container will be placed

  • IYC load: With the container loaded, time spent in move from the transfer area to the wagon where the container will be placed.

  • Strad: Move the laden Strad to the position where the container will be delivered, could be a transfer area, a position in the yard or a truck.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

M

order; che,

GRAMMAR

POINT OF MEASUREMENT

O

pom: output

pomt: actual, estimated

GRAMMAR

OBSERVED PROPERTY

M

status, duration, timer, distance

GRAMMAR

Value

M

GRAMMAR

Related standards

O

TIC Description

Related TIC 4.0 definition

O

TIC Description

Example

M

TIC Description

Example in the context of the grammar

M

TIC Description

Link to one or more operational processes

M

TIC Description

Search tags

M

carry underway, laden

Technical

Version / Date

M

2023.007 - 25/03/2023

Technical

Internal TIC Version

M

20230216

Technical

M = Mandatory

O = Optional


Created by

Edited by

Review / Approve

Published

 Francisco Blanquer Jaraiz 2023-02-16

 

 

 

  

 

 