TIC 4.0

Ir al final de los metadatos
Ir al inicio de los metadatos

Estás viendo una versión antigua de esta página. Ve a la versión actual.

Comparar con el actual Ver el historial de la página

« Anterior Versión 2 Siguiente »

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

movingtodeliver

GRAMMAR

Concept name

M

Moving To Deliver

GRAMMAR

Concept type

M

action

GRAMMAR

Also known as

O

TIC Description

Definition

M

Move the equipment to the final position of the container .

TIC Description

Further Detail

O

This stage starts when the che picks or receives the container, and ends when the che arrives to the destination position of the container.

  • STS Load: With the container loaded, time spent in move from the berth to the row of the vessel where the container will be placed

  • STS Discharge: With the container loaded, time spent in move from the vessel to the lane or transfer zone area.

  • TT Load: Move with the container loaded from the yard to the QC Lane where the container will be picked.

  • TT Discharge: Move with the container loaded from QC to the yard position where the container will be picked.

  • RTG: Move the RTG to the position where the container will be delivered, could be a truck Lane or a transfer zone area.

  • Strad: Move the Strad to the position where the container will be delivered, could be a transfer area, a position in the yard or a truck.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

M

order; che,

GRAMMAR

POINT OF MEASUREMENT

O

pom: output

pomt: actual, estimated

GRAMMAR

OBSERVED PROPERTY

M

status, duration, timer, distance

GRAMMAR

Value

M

GRAMMAR

Related standards

O

TIC Description

Related TIC 4.0 definition

O

TIC Description

Example

M

TIC Description

Example in the context of the grammar

M

TIC Description

Link to one or more operational processes

M

TIC Description

Search tags

M

Technical

Version / Date

M

2023.007 - 25/03/2023

Technical

Internal TIC Version

M

20230216

Technical

M = Mandatory

O = Optional


Created by

Edited by

Review / Approve

Published

 Francisco Blanquer Jaraiz 2023-02-16

 

 

 

  

 

 

  • Sin etiquetas