Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

notavailable_and_wasplannedisplanned

GRAMMAR

Concept name

M

Not available and Was Is Planned

GRAMMAR

Concept type

M

Status

GRAMMAR

Also known as

O

Planned

TIC Description

Definition

M

Subject is not available to be used or obtained due to a planned closure .(event notified at least 12 hours in advance)

TIC Description

Further Detail

O

This concept can be used for multiple subjects:

  1. Terminal: “not available was is planned” refers to “terminal not open and not accessible” due to scheduled closures

  2. CHE: “not available was is planned” means that the machine is unavailable due to a planned closure.

  3. Actor or (human) user: “not available was is planned” means that the actor is unavailable due to public holidays, legal rest times, religious customs and others.

TIC Description

Required Information

M

TIC Description

SUBJECT

 

Terminal, Throughput, Performance, Berth, Yard, Gate, CHE

 

POINT OF MEASUREMENT

 

Scheduled, Actual, estimated

 

OBSERVED PROPERTY

 

status; duration; counter; totalcounter; timer; totaltimer

 

Value

 

status: boolean; duration and timer: seconds, totaltimer: hour.

 

Related standards

O

TIC Description

Related TIC 4.0 definition

O

notavailable; available_and_wasschedule; availableand_wasplanned; notavailable_and_wasschedule; notavailable_and_wasplanned;Is Scheduled Is Planned Not available and Is Scheduled Not available and Is Planned Terminal Closed Is Scheduled Terminal Closed Is Planned

TIC Description

Example

M

Terminal “not available and was planned”, The terminal is open and accessible.

tos|@|terminal|@|notavailable_and_wasplannedisplanned|status|output|actual|value = true

Terminal has been “not available and was planned” (closed due to scheduled closures) during the last year during a total of 14 days

tos|@|terminal|@|notavailable_and_wasplannedisplanned|status|output|actual|#unit#day|timer= 14

CHE “not available scheduled”, The CHE is not ready to receive orders due to a scheduled closure

tos|@|che|@|notavailable_and_wasplannedisplanned|status|output|actual|value = true

Position “not available and was planned”, a specific position in the yard is “not available” due to a scheduled event (for example, maintenance operations).

tos|@|position |@|notavailable_and_wasplannedisplanned|status|output|actual|value = true

TIC Description

Example in the context of the grammar

M

See belowimage-20241120-162228.pngImage Added

TIC Description

Link to one or more operational processes

M

terminal closed planned, terminal planned, holidays

TIC Description

Search tags

M

20241029

Technical

Version / Date

M

R0.120241120

Technical

Internal TIC Version

M

terminalclosedschedulednotavailableandisplanned

Technical

M = Mandatory

O = Optional

...