Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

...

CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

wasscheduledisscheduled

GRAMMAR

Concept name

M

Was Is Scheduled

GRAMMAR

Concept type

M

Status

GRAMMAR

Also known as

O

action scheduled, timetable, regular program.

TIC Description

Definition

M

Status indicates that the subject concept was intended to be or do regularly in the far future, for example, a timetable.

TIC Description

Further Detail

O

This concept can be used for multiple subjects:

  1. Terminal: “not available and was is scheduled” refers to “terminal not open and not accessible” due to scheduled closures

  2. CHE: In the context of maintenance, "inspection was is scheduled" refers to the regular inspections that a CHE undergoes as part of a regular preventive maintenance program.

  3. Actor (human): A technician who is assigned to perform "was is scheduled inspections" for a specific CHE.

TIC Description

Required Information

M

TIC Description

SUBJECT

 

Terminal, Berth, Yard, Gate, CHE, Actor,

 

POINT OF MEASUREMENT

 

Scheduled

 

OBSERVED PROPERTY

 

status; duration; counter; totalcounter; timer; totaltimer

 

Value

 

status: boolean; duration and timer: seconds, totaltimer: hour.

 

Related standards

O

TIC Description

Related TIC 4.0 definition

O

notavailable; available_and_wasschedule; availableand_wasplanned; notavailable_and_wasschedule; notavailable_and_wasplanned;Is Scheduled Is Planned Not available and Is Scheduled Not available and Is Planned Terminal Closed Is Scheduled Terminal Closed Is Planned

TIC Description

Example

M

  • Terminal “not available was is scheduled”, The terminal is closed due to a scheduled event (e.g., severe weather with a 12-hour notice period)

    • tos|@|terminal|@|notavailable_and_wasscheduledisscheduled|status|output|actual|value = true

  • Terminal has been “not available was scheduled” (closed due to scheduled closures) during the last year during a total of 14 days

    • tos|@|terminal|@|notavailable_and_wasscheduledisscheduled|status|output|actual|#unit#day|timer= 14

  • A technician has dedicated 20 hours to run scheduled inspections during the last year

    • AMS|@|actor|@|task|@|inspecting_and_isscheduled|status|schedule|totalcounter = 20

TIC Description

Example in the context of the grammar

M

imagen-20241114-171630.png

TIC Description

Link to one or more operational processes

M

terminal closed scheduled, terminal closed, holidays, Inspecting Diagnosing Repairing

TIC Description

Search tags

M

20241029

Technical

Version / Date

M

R0.120241029

Technical

Internal TIC Version

M

scheduleisschedule

Technical

M = Mandatory

O = Optional

...