...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
CONCEPT
...
Required
...
Related standards
...
Related TIC 4.0 definition
HEADER
Info |
---|
Identifies the message in origin, destination, time and unique reference (use this link for more information) |
...
Mandatory
...
Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end
...
Optional
...
(Header topic; Header identifier)
SUBJECT
Info |
---|
Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information) |
...
Default
...
Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable)
...
Suitable
...
Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples)
POINT OF MEASUREMENT
Info |
---|
It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information) |
...
Default
...
IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified)
...
Optional
...
Control (from where)
OBSERVED PROPERTY
Info |
---|
It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information) |
...
Default
...
Status; %; Speed; Counter; Distance; Timer; Energy; Average; …
...
Suitable
...
Specify units when they are different than the International System
...
Units
...
True/False
Draws
Info |
---|
(optional) add some draws to explain the concept |
Diagrams
Info |
---|
(optional) add some process diagram which concept belongs |
Attached documents
Info |
---|
(optional) add some document to explain the concept |
Examples
Human
1.20191205 12:00 London-Gate03 move “get_in” “out=result” actual boxes “1”
2.20191205 12:06 London-TZ01 move “occupied” in actual boxes “1”
3.20191205 12:18 London-SC74 move “in” actual boxes “1” (waiting for orders)
4.20191205 12:22 London-SC74 move “Lock” actual boxes “1”
5.20191205 12:22 London-TZ01 move out actual boxes “1”
6.20191205 12:32 London-Yard_A-34B56 move “occupied” in actual boxes “1”
JSON:
XML:
MQTT:
Created by
Edited by
Review / Approve
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | on_standby | GRAMMAR |
Concept name | M | On Standby | GRAMMAR |
Concept type | M | statusActivity | GRAMMAR |
|
|
|
|
Also known as | O | On; Not Off; Power On; Ready to work; standby; With power; Engine on; Power supply on; idle; | TIC Description |
Definition | M | If the subject is “On” [If the main power supply and all subject systems are ready able to operate (do the job it has been designed for) the subject in less than 2 seconds 5 seconds requiring no more (a maximum) than one (not a sequence) operator action] but any (at least one) of them (power supply or subject system) is not currently ready then TRUE else FALSE | TIC Description |
Further Detail | O | On Standby is a special type of On status where the subject is not currently ready but almost and just need a maximum of one operator action (a sequence from the operator is not required just one action). If off Off is TRUE then on_standby has to be FALSE standby is FALSE off_to_on_time = 5 (default if not value is consider) | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT |
| #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate; #Terminal; #MC; #TOS ; #LuminaryCHE; control; health; powersource; drive; spreader; hoist; trolley; boom; cabin; TOS; Terminal; Gate; TOS ; Luminary |
|
POINT OF MEASUREMENT |
| #inputinput; #internal_in ; #internal_out ;#output#schedule; #planning; #estimated; #actual; #performediinput ; ioutput ;output schedule; planning; estimated; actual; performed |
|
OBSERVED PROPERTY |
| #statusstatus; #counterduration; #durationcounter; #timertotalcounter; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter; #distance;timer; totaltimer |
|
Value | TRUE; FALSE; real number; integer | status: boolean; duration and timer: seconds, totaltimer: hour. |
|
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | #off; #on_standbyhttps://tic40.atlassian.net/l/c/zf6c0sN4 https://tic40.atlassian.net/l/c/1Dz2Di1R https://tic40.atlassian.net/l/c/9N9rP5NW | TIC Description |
Example | M | che_on_.standby.status: TRUE = the Container Handler Equipment is ready to operate or do its job properly in less than 2 5 seconds because the power, the control and all of its systems are able to be ready on time but currently is not. che_spreader_on_.spreader.standby.status: TRUE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 5 seconds but currently is not. che_engine_on_.engine.standby.status: FALSE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 5 seconds but currently is not. | TIC Description |
Example in the context of the grammar | M | An RTG with the Engine and control On but the drivers off and the cabin gate open: che_.engine_.on_.status: TRUE; che_.drivers_.on_.status: FALSE; che_.control_.on_.status: TRUE; che_.cabingateopen_.status: TRUE; che_.on_.status: TRUE; che_on_.standby_.status: TRUE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
M = Mandatory
O = Optional
OLD PROPOSAL
...
ID
...
37
...
Name
...
CHE Activity On
...
Abbreviation
...
che.activity.on.command||request||feedback||action.status||counter||timer||energy||distance
...
Category
...
Also known as
...
On; Running; Power On; Engine On
...
Definition
...
IF (CHE_Activity_Off.status : False) then True else False
...
Further Detail
...
CHE_Activity_On is the opposite of CHE_Activity_Off, when a CHE is not off is on, it doesn't give any extra information. If main power supply is available in less than 2 seconds then true else false. CHE_Activity_Working and CHE_Activity_Working_Idle is under ON, so a machine that is ON only can be Working or Idle. CHE_Activity_On is the contrary of CHE_Activity_Off
CHE with the operator seated, engine standby (start-stop system), CHE ready to operate just when driver move the joystick then ON: che.engine.on.status: FALSE; che.control.on.status: TRUE; che.seat.operator.on.status: TRUE; che.on.status: TRUE; che.standby.status: TRUE: CHE with the operator not seated, engine standby (start-stop system), CHE ready to operate just when driver seated and move the joystick then OFF: che.engine.on.status: FALSE; che.control.on.status: TRUE; che.seat.operator.on.status: FALSE; che.on.status: FALSE; che.standby.status: FALSE JSON example:
| TIC Description | |||||
Link to one or more operational processes | M | TIC Description | ||||
Search tags | M | #OFF; #Off; #standby; #running; #working | Technical | |||
Version / Date | M | 2021.1 - 30/04/2021 | Technical | |||
Internal TIC Version | M | 20210422 consistency review 20210816 semantic off_to_on_time = | Technical |
M = Mandatory
O = Optional
...
Created by | Edited by | Review / Approve | Published |
Francisco Blanquer Jaraiz 2020-03-18 |
|
|
|
Francisco Blanquer Jaraiz 2021-04-22 |
|
| |
Francisco Blanquer Jaraiz 2021-08-16 |