...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
...
OBSERVED PROPERTY
Fields | Type | Description | Purpose |
---|---|---|---|
ID ( |
Observed Property identifier) | M |
gross | GRAMMAR |
Observed Property name | M |
Gross | GRAMMAR |
Observed Propertytype | M |
weight | GRAMMAR | ||
Also known as | O | gross weight; payload, total weight. | TIC Description |
Definition | M | The |
whole weight of |
the |
subject including the |
weight of the subject itself (tare) and all carried by it (nett). | TIC Description | |
Further Detail | O | TIC 4.0 “subject” can be an object (cargo, che, spreader) or a process (cargovisit, cycle) or a system (hoist, trolley). If “weight” refers to a subject that is a process or a system (not an object itself), “weight” applies to the payload that is being processed or managed by the “subject”. The weight can be observed from 3 different perperspectives: Nett, Tare and Gross where: Specific cases: Specific cases: cargovisit.weight defines the weight of the cargo of the cargo visit process. E.g. during a container visit to a terminal the cargovisit.weight.gross.value will be the total weight of the container itself(Tare weight) plus the weight of the cargo. If there is a verified gross mass (VGM), then it equals the gross weight (cf. IMO XYZ). cycle.weight defines the weight of the payload that is being moved. che.cycle.weight defines the weight of |
the payload that is being moved by the CHE. The cycle is a process that only refers to the cargo, so the cycle weight does not include the spreader, which is part of the CHE. E.g during a STS twin move the che.cycle.weight.gross.output.actual.ton.value will be the total gross weight of the two containers moved by the STS.
E.g with objects che.weight.gross.output.actual.ton.value = 150 tons means that the CHE plus whatever cargo it is handling weighs 150 tons. che.weight.tare.output.actual.ton.value = 138 tons means that the CHE itself weighs 138 tons. che.spreader.weight.tare.output.actual.ton.value = 12 tons means that the spreader itself weighs 12 tons. che.spreader.weight.gross.output.actual.ton.value = 22 tons means that the spreader plus whatever it carries or it is attached weighs 22 tons. che.spreader.weight.nett.output.actual.ton.value = 10 tons means that payload that is being moved by the spreader weighs 10 tons (the container) Usually when a cargo visit is handled by a CHE will result in: cargovisit.weight.gross should have the same value as any che.spreader.weight.nett (gross cargo weight under the spreader)that is handling the cargo during its visit. | TIC Description | |
Required Information | M | SUBJECT |
, CONCEPTand VALUE | TIC Description |
SUBJECT |
|
cargovisit, CHE, spreader, hoist |
|
POINT OF MEASUREMENT |
|
pom: output pomt: actual |
|
CONCEPTS |
|
weight |
|
Value |
|
ton |
| ||
Related standards | O |
| TIC Description |
Related TIC 4.0 definition | O | WeightGross [REVIEW] Nett [REVIEW] Tare (Review) weightrear; weightfront | TIC Description |
Example | M |
The gross weight of the container is 24 tonnes.
A 10 ton container: tos.cargo.weight.nett.ouput.actual.ton = 6 tos.cargo.weight.gross.output.actual.ton = 10 tos.cargovisit.weight.gross.output.actual.ton =10 che.spreader.weight.gross.output.actual.ton = 22 che.spreader.weight.tare.output.actual.ton = 12 che.spreader.weight.nett.output.actual.ton = 10 che.hoist.weight.gross.output.actual.ton = 22 che.hoist.weight.nett.output.actual.ton = 10 che.hoist.weightfront.gross.output.actual.ton = 12 che.hoist.weightrear.gross.output.actual.ton = 10 che.cycle.weight.totalgross.output.actual.ton = 3456 | TIC Description | |
Example in the context of the process | M |
STS01; LOAD_GROSS and 24 Tonnes
The gross load on STS01 is 24 Tonnes.
RTG01; LOAD_GROSS and 20Tonnes
The gross load on RTG01 is 20 Tonnes.
| TIC Description | ||
Link to one or more operational processes | M |
Move.
TIC Description | |
Search tags | M |
weight, net, nett, tare, gross, poid, mass, deplacement. | Technical |
Version / Date | M |
2022.004 - 15/03/2022 | Technical |
Internal TIC Version | M |
20220422 | Technical |
M = Mandatory
O = Optional
Created by | Edited by | Review / Approve | Published |
|
Francisco Blanquer Jaraiz 2020-01-01 | Francisco Blanquer Jaraiz 2022-03-10 |
|
|
| Francisco Blanquer Jaraiz 2022-04-24 |
|
|