...
...
...
...
...
...
...
...
...
...
...
...
...
...
CONCEPT
POINT OF MEASUREMENT
Info |
---|
It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information) |
...
Default
...
IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified)
...
Optional
...
Control (from where)
OBSERVED PROPERTY
Info |
---|
It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information) |
...
Default
...
Status; %; Speed; Counter; Distance; Timer; Energy; Average; …
...
Suitable
...
Specify units when they are different than the International System
...
Units
...
True/False
Draws
Info |
---|
(optional) add some draws to explain the concept |
Diagrams
Info |
---|
(optional) add some process diagram which concept belongs |
Attached documents
Info |
---|
(optional) add some document to explain the concept |
Examples
Human
1.20191205 12:00 London-Gate03 move “get_in” “out=result” actual boxes “1”
2.20191205 12:06 London-TZ01 move “occupied” in actual boxes “1”
3.20191205 12:18 London-SC74 move “in” actual boxes “1” (waiting for orders)
4.20191205 12:22 London-SC74 move “Lock” actual boxes “1”
5.20191205 12:22 London-TZ01 move out actual boxes “1”
6.20191205 12:32 London-Yard_A-34B56 move “occupied” in actual boxes “1”
JSON:
XML:
...
Fields | Type | Description | Purpose |
---|---|---|---|
ID |
36
Name
CHE Activity Off
Abbreviation
che.activity.off.command||request||feedback||action.status||counter||timer||energy||distance
Category
(optional) Tag (Activity, Move, Functional, Operational, OS, etc) groups at a high level the property concept and establish a hierarchy. It is a tag that helps to identify and describe the property. The objective helps the human to classify, find, use the properties. Ie: move; activity; functional, operational, control, TOS. One concept can have several families but must be a closed list.
Also known as
Engine off; power supply off
Definition
If main power supply is available to operate in less than 2 seconds then false else true
Further Detail
(Concept identifier) | M | off | GRAMMAR |
Concept name | M | Off | GRAMMAR |
Concept type | M | status | GRAMMAR |
Also known as | O | Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off; turned off; Out of operations; idle; not running; | TIC Description |
Definition | M | If the main power supply and all subject systems are not ready to operate (do the job it has been designed for) the subject in less than 5 seconds or requires more than one operation action (a sequence) then TRUE else FALSE | TIC Description |
Further Detail | O | This definition is the opposite to the “On” concept. If “On” is TRUE then “Off” is FALSE and vice-versa. If the power subject system is not able to supply the energy for normal operation or the “control” of the subject is “off” or any of the subject systems or subsystems is not ready to run the subject for its normal “job” in less than |
This definition is complementary to CHE_Activity_On_Standby
Required
Related standards
Related TIC 4.0 definition
HEADER
Info |
---|
Identifies the message in origin, destination, time and unique reference (use this link for more information) |
...
Mandatory
...
Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end
...
Optional
...
(Header topic; Header identifier)
SUBJECT
Info |
---|
Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information) |
...
Default
...
Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable)
...
Suitable
...
Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples)
5 seconds (default off_to_on_time = 5) or it is required an operator sequence actions then it is considered off. If you are moving from On to Off and you can not stop the process to return to On in less than 5 (default off_to_on_time = 5) seconds then you are Off. off_to_on_time = 5 (default if not value is consider) | TIC Description | |||||||
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description | |||||
SUBJECT | M | CHE; control; health; powersource; drive; spreader; hoist; trolley; boom; cabin; TOS; Terminal; Gate; TOS ; Luminary | GRAMMAR | |||||
POINT OF MEASUREMENT | O | input; iinput ; ioutput ;output schedule; planning; estimated; actual; performed | GRAMMAR | |||||
OBSERVED PROPERTY | M | status; duration; counter; totalcounter; timer; totaltimer | GRAMMAR | |||||
Value | M | status: boolean; duration and timer: seconds, totaltimer: hour. | GRAMMAR | |||||
Related standards | O | TIC Description | ||||||
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/c/FUfm0K2P https://tic40.atlassian.net/l/c/EGRtUay9 https://tic40.atlassian.net/l/c/9N9rP5NW | TIC Description | |||||
Example | M | che.off.status: TRUE = the Container Handler Equipment is not ready to operate or do its job properly in less than 5 seconds because no power, no control or any of its systems is not able to be ready on time. (E.g an RTG crane diesel engine is running, but the variable frequency drives are not switched on so an action and/or more than 5 seconds are needed to start and activity and move to on/onstandby status.) che.spreader.off.status: FALSE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 5 seconds. che.engine.off.status: TRUE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 5 seconds. tos.off.status: TRUE = the complete system is not running and does not allow users or machines to login. | TIC Description | |||||
Example in the context of the grammar | M | An RTG with the Engine On but the drivers off and the control off che.engine.off.status: FALSE; che.drivers.off.status: TRUE; che.control.off.status: TRUE; che.off.status: TRUE JSON example
| TIC Description | |||||
Link to one or more operational processes | M | TIC Description | ||||||
Search tags | M | #OFF; #Off; #standby; #running; #working | Technical | |||||
Version / Date | M | 2021.1 - 30/04/2021 | Technical | |||||
Internal TIC Version | M | 20210422 consistency review 20210816 semantic off_to_on_time = | Technical |
M = Mandatory
O = Optional
...
Created by | Edited by | Review / Approve | Published |
Francisco Blanquer Jaraiz 2020-03-18 |
|
|
|
Francisco Blanquer Jaraiz 2021-04-22 |
|
| |
Francisco Blanquer Jaraiz 2021-08-16 |