CONCEPT
Fields | Type | Description | Purpose | |||||
---|---|---|---|---|---|---|---|---|
ID (Concept identifier) | M | on_standby | GRAMMAR | |||||
Concept name | M | On Standby | GRAMMAR | |||||
Concept type | M | Activity | GRAMMAR | |||||
Also known as | O | On; Not Off; Power On; Ready to work; standby; With power; Engine on; Power supply on; idle; | TIC Description | |||||
Definition | M | If the subject is “On” [If the main power supply system and all subject systems are ready able to operate (do the job it has been designed for) the subject in less than 2 seconds with maximum of one operation action 5 seconds requiring no more (a maximum) than one (not a sequence) operator action] but any (at least one) of them (power supply or subject system) is not currently ready then TRUE else FALSE | TIC Description | |||||
Further Detail | O | On Standby is a special type of On status where the subject is not currently ready but almost and just need a maximum of one operation actionone operator action (a sequence from the operator is not required just one action). If Off is TRUE then standby is FALSE off_to_on_standby is FALSEtime = 5 (default if not value is consider) | TIC Description | |||||
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description | |||||
SUBJECT |
| #CHE; #Gate; #Terminal; #MC; #TOS ; #LuminaryCHE; control; health; powersource; drive; spreader; hoist; trolley; boom; cabin; TOS; Terminal; Gate; TOS ; Luminary |
| |||||
POINT OF MEASUREMENT |
| #inputinput; #internal_in ; #internal_out ;#output#schedule; #planning; #estimated; #actual; #performediinput ; ioutput ;output schedule; planning; estimated; actual; performed |
| |||||
OBSERVED PROPERTY |
| #statusstatus; #counterduration; #durationcounter; #timertotalcounter; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter; #distance;standby_to_operative_timer = 2 (default)timer; totaltimer |
| |||||
Value | TRUE; FALSE; real number; integer | status: boolean; duration and timer: seconds, totaltimer: hour. |
| |||||
Related standards | O |
| TIC Description | |||||
Related TIC 4.0 definition | O | #off; #on_standbyhttps://tic40.atlassian.net/l/c/zf6c0sN4 https://tic40.atlassian.net/l/c/1Dz2Di1R https://tic40.atlassian.net/l/c/9N9rP5NW | TIC Description | |||||
Example | M | che_on_.standby_.status: TRUE = the Container Handler Equipment is ready to operate or do its job properly in less than 2 5 seconds because the power, the control and all of its systems are able to be ready on time but currently is not. che_.spreader_on_.standby_.status: TRUE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 5 seconds but currently is not. che_.engine_on_.standby_.status: FALSE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 5 seconds but currently is not. | TIC Description | |||||
Example in the context of the grammar | M | An RTG with the Engine and control On but the drivers off and the cabin gate open: che_.engine_.on_.status: TRUE; che_.drivers_.on_.status: FALSE; che_.control_.on_.status: TRUE; che_.cabingateopen_.status: TRUE; che_.on_.status: TRUE; che_on_.standby_.status: TRUE CHE with the operator seated, engine standby (start-stop system), CHE ready to operate just when driver move the joystick then ON: che_.engine_.on_.status: FALSE; che_.control_.on_.status: TRUE; che_.seat_.operator_.on_.status: TRUE; che_.on_.status: TRUE; che_on_.standby_.status: TRUE: CHE with the operator not seated, engine standby (start-stop system), CHE ready to operate just when driver seated and move the joystick then OFF: che_.engine_.on_.status: FALSE; che_.control_.on_.status: TRUE; che_.seat_.operator_.on_.status: FALSE; che_.on_.status: FALSE; che_on_standby_status: FALSE.standby.status: FALSE JSON example:
| TIC Description | |||||
Link to one or more operational processes | M Any CHE load or discharge operation. | TIC Description | ||||||
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical | |||||
Version / Date | M | TIC_Q4_2020 / 15.09.20202021.1 - 30/04/2021 | Technical | |||||
Internal TIC Version | M definition technical group | 20210422 consistency review 20210816 semantic off_to_on_time = | Technical |
M = Mandatory
O = Optional
JSON:
XML:
...
...
Created by | Edited by | Review / Approve | Published |
Francisco Blanquer Jaraiz 2020-03-18 |
|
|
|
Francisco Blanquer Jaraiz 2021-04-22 |
|
| |
Francisco Blanquer Jaraiz 2021-08-16 |