SUBJECT
Fields | Type | Description | Purpose | |||||
---|---|---|---|---|---|---|---|---|
ID (identifier) | M | cycle | GRAMMAR | |||||
Subject Name | M | Cycle | GRAMMAR | |||||
Subject Type | M | Process | GRAMMAR | |||||
Also known as | O | CHE cycle; move; working cycle; working process | TIC Description | |||||
Definition | M | A Cycle is a discrete (individually, separate and distinct) process designed (destinated) to move payloads from one location to another by a subject (che, tos, terminal, carrier, etc) | TIC Description | |||||
Further Detail | O | CYCLE Start and End: A subject can execute cycles in paralel (many at the same time like a terminal with several STS) or in serial (just one after the other like a classical CHE). The paralell cycles are built by several serial cycles. A serial cycle can also be also built with several subprocess running in serial independtly independently like a double trolley STS where a cycle can be started (trolley seaside) before the previuous one is ended (trolley landside). The “basic cycle” is the one that only can be performed once the previous one is ended, any other type of cycle is just an aggregation of these basic cycle cycles (parallel or multiple serial independent ones). This basic cycle is the most common one we can find. For example in the case of a CHE, the new CHE.CYCLE starts when the previous one is ended and not just when the CHE pickup picked up the payload. The “paralell cycle” (several basic cycles working in parallel) is the most common in big systems like the a “terminal” or a “yard” or a “gate” where several CHE are working in paralell. The cycle will have the “start” when the process to move payload begings, this happens when the subject start to execute the process to pickup the payload (usually when the che or terminal start to execute the process to pickup a cargo) and finished when the subject deliver the payload (usually when the che or the terminal unlock or deliver to the carrier the cargo). CYCLE Agregation The subject always define the perimeter of the cycle agregation. The cycle of a subject is not the sum of all its subsubject cycles. Therefore, the terminal.cycle.move.box is not the sum of all its che.cycle.move.box. The simplest example is a CHE with just a basic cycle, where only has one trolley and one spreader. The che.cycle and the che.spreader.cycle or the che.trolley.cycle just it is the same as there is only one spreader and one trolley. Only for this case the sum of the trolley cycle is the same than the che cycle. If the cycle is not basic then to build the subject cycle you need to do an agregation only of some subsbuject cycles. Example: to calculate the terminal.cycle.move.box (ended) you have to agregated all the che.cycle.move.box (loading) of any machine that is loading a carrier (vessel, truck, traing etc). This means that you must sum only the subsubject in charge of the subject.cycle.move “end” process. In the case of the terminal the machines that load the carriers. In the case of a multitrolley che the trolley that loads the carrier or che (discharging the land trolley, and loading the seatrolley). CYCLE Payload Payload includes everthing: cargo, special moves, gages, twislocks boxes, hatchcovers, etc If you need to filter by an specific payload you always can do it or just sum the specific value of subject.cycle.move.counter(box,teu,etc) CONCEPTs for CYCLE: A cycle also can have a link with other subjects like cargo, cargovisit, carrier, and carriervisit. This link can be made one to several with an array of subject id. Example: if a cycle has moved one container you can express the relation between them.
CHE.CYCLE On & Off The che.cycle is the cycle performs by a CHE, so the subject has the hability to turn ON and OFF. Due to this particularity it is considered that the process to move payloads will always start with the turn ON of the CHE and end with the turn OFF of the CHE. Therefore the serial basic CYCLE starts when the subject turns ON or previous cycle ends and a CYCLE ends when the subject turns OFF or finishes the job it was designed for (safely unlock the payload that has been moved). Could happen that a cycle does not move anything, because the subject just turns ON and then OFF. A CYCLE is a process “design for” to move a payload. In some cases, the cycle does not necessarily have to move a payload. When there is a payload involved in the cycle, this cycle will have a move.value (1), if there is no payload involved then this cycle will have a move.value(0). Laden and Unladen cycle The “basic cycle” always has two subprocesses, one with cargo that represents the Laden Cycle and another without cargo that represents the Unladen Cycle. Usually the “basic cycle” (not starting or finishing with an OFF status) will start with the start (begining) of the unladen cycle and finish with the end of Laden cycle. An unladen cycle just describes the basic cycle process of a subject (normally a CHE) performs without a payload(s). A laden cycle describes the basic cycle process of a subject (normally a CHE) with a payload(s). The Laden and Unladen process also have and start and end. See diagram below for more details. Terminal.CYCLE Pending 2022.003 release TOS.CYCLE Pending 2022.004 release | TIC Description | |||||
Required Information | M | SUBJECT, CONCEPT; OBSERVED PROPERTY and VALUE | TIC Description | |||||
SUBJECTS | #che; #tos; #terminal; #berth; #gate; #rail |
| ||||||
CONCEPT |
| #Id; #loading; #discharging; #useful; #unuseful; #paid; #unpaid; #handling reason; #move; #load; #start; #end; #energy; #laden; #unladen; #active; #inactive; #idle; #working. |
| |||||
Related standards | O | TEU definition; Container definition; ISO 8601 | TIC Description | |||||
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/c/3pujAL8E https://tic40.atlassian.net/l/c/uF2W63Ut https://tic40.atlassian.net/l/c/0X0Ad1XR Laden; Unladen; Paid; Unpaid; Useful; UnUseful; https://tic40.atlassian.net/wiki/spaces/REV/pages/420643176/Single+Review?atlOrigin=eyJpIjoiZDAyMDQ3MmEyZTMwNGM2ODk2YTBjZjJkMmNmNzE4ZTUiLCJwIjoiYyJ9 https://tic40.atlassian.net/l/c/0yoXXmak https://tic40.atlassian.net/l/c/rSFwbtAG https://tic40.atlassian.net/l/c/UXknxhhc; Hatchcover; Lashing cage; Breakbulk; Bundle; Gearbox; CHain; OHF; double Spreader; Doule trolley; solid bulk; double Boom; Multitrolley. | TIC Description | |||||
Example | M | see below diagrams and draws | TIC Description | |||||
Example in the context of the grammar | M | CHE.CYCLE
TOS.CYCLE tos.jobinstruction.cycle pending 2022.003 release. tos.terminal.cycle pending 2022.003 release. | DATA MODEL | |||||
Link to one or more operational processes | M | All cargo operation is related to cycle. | TIC Description | |||||
Search tags | M | Technical | ||||||
Version / Date | M | 2021.002 / 19.10.2021 | Technical | |||||
Internal TIC Version | M | Reviewed | Technical |
...