CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

cycle

GRAMMAR

Concept Name

M

Cycle

GRAMMAR

Concept Type

M

Process

GRAMMAR

Also known as

O

Machine CHE cycle

TIC Description

Definition

M

A Cycle characterises a discrete process that involves a subject (ie process, CHE…CHE or any subsubject like trolley, spreader; also valid for TOS cycles) when moving a payload (which can be aggregated into different units) from one location to another.

TIC Description

Further Detail

O

A single CYCLE can be described as the sum of numerous subject Moves.

The subject Cycles are always related to the subsystems of the subject (ie i.e. spreader of the STS, RTGs of the Yard, and STSs of the Berth). A complete subject Cycle of one subsystem starts when the previous one finishes (it is cyclical), and finishes when the cargo is completely released from the considered sub-system (realise from realise). Thus, the job of the subsystem is done and the next job is ready to start (e.g. for an STS the spreader has all twistlocks open and starts the next job. For a Yard, when the RTG or the SC releases the container in the yard or take takes out the container and releases it on the TZ).

Laden and Unladen cycle

The system cycle starts with the start of the unladen cycle and ends with the start of the next unladen cycle. An unladen cycle describes the movements of a system without payload(s). A laden cycle describes the movements of a CHE with payload(s)Concepts for CYCLE:
Id, loading, discharging, useful, unuseful, paid, unpaid, handling reason, move, load, energy, start, end, laden, unladen, active, inactive, idle (nothing to do and not work instruction) , working (doing something che.working.status: true, or with a work instruction).

A cycle also can have a link with: cargo, cargovisit, carrier, and carriervisit.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

 

#CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate; #Terminal; #MC;

 

POINT OF MEASUREMENT

 

#input;#output

#schedule; #planning; #estimated; #actual; #performed

 

OBSERVED PROPERTY

 

#status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter; #distance; #coordinate
#location

 

Value

 

integer

 

Related standards

O

 TEU definition; Container definition; ISO 8601

TIC Description

Related TIC 4.0 definition

O

Move; Payload; Cargo; Cycle; Laden; Unladen; Paid; Unpaid; Useful; UnUseful; Single; Twin; Tandem; Quad; Hatchcover; Lashing cage; Breakbulk; Bundle; Gearbox; CHain, OHF; double Spreader; Doule trolley; solid bulk; double Boom; Multitrolley.

TIC Description

Example

M

see below

TIC Description

Example in the context of the grammar

M

che_cycle_output_value: how many cycles the CHE has finished during a period of time defined in the header.

TIC Description

Link to one or more operational processes

M

Any CHE load or discharge operation.

TIC Description

Search tags

M

Technical

Version / Date

M

TIC_Q4Q3_2020 2021 / 2127.0108.2021

Technical

Internal TIC Version

M

definition technical group

Technical

...

Info

(optional) add some draws to explain the concept

Standard STS examples

 

Image Modified

 

Single move

che.cycle.move.counter.

1 unit / box

1 cycle

Image Removed

cycle=1

che.cycle.move.counter.

box=1

Image Added

 

Image Removed

Double spreader move

3 units / boxes

1 cycle

Image Removed

Twin move

2 units / boxes

1 cycle

Image Removed

Tandem move

2 units / boxes

1 cycle

Image Removed

Quad move

4 units / boxes

1 cycle

Image Removed

Hatchcover move

1 unit

1 cycle

Image Removed

Lashing cage move

1 unit

1 cycle

Image Removed

Breakbulk move

1 unit

1 cycle

Image Removed

Bundle move

4 units

1 cycle

Image Removed

Gearbox move

1 unit

1 cycle

Image Removed

Chain move

1 unit

1 cycle

Image Removed

OHF move

1 unit

1 cycle

Other cranes examples

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=2

Image Added

 

Tandem move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=2

Image Added

 

Quad move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=4

Image Added

 

Hatchcover move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

hatcover=1

Image Added

 

Lashing cage move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

lashingcage=1

Image Added

 

Breakbulk move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

unit=1

Image Added

 

Bundle move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

unit=4

Image Added

 

Gearbox move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

gearbox=1

Image Added

 

Chain move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

unit=1

Image Added

 

OHF move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

unit=1

Other cranes examples

Image Added

 

Double spreader move

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=3

Image Added

 

Double trolley move (doble hoist with buffer and backreach trolley)

3 units / boxes

1 waterside side che.cycle.move.counter.

cycle=4

che.cycle.move.counter.

box=3

note: 1 waterside trolley+3 backreach trolley=4 cycles (independent)

 

Double trolley move (double hoist with buffer)

4 units / boxes

che.cycle.move.counter.

cycle=5

che.cycle.move.counter.

box=4

note: 1 waterside trolley +4 backreach trolley=5 cycles (independent)

 

Double trolley move (with buffer)

che.cycle.move.counter.

cycle=3

che.cycle.move.counter.

box=4 units / boxes

note: 1 waterside trolley+2 backreach trolley= 3 cycles (independent)

 

Solid bulk Bivalve Grab

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

unit/ Grab grab capacity=1 cycle

 

Solid/liquid/gas with pipeline

1 unit / Depot or hold capacity

note: Non-cycle. Continuous process

 

Double boom double trolley move

che.cycle.move.counter.

cycle=4

che.cycle.move.counter.

box=4 units / boxes

note: 1+1+1+1 = 4 cycles (independent)

 

Double trolley (first continuous) move (with buffer)

che.cycle.move.counter.

1 unit / box

cycle=2

che.cycle.move.counter.

box=1

note: 1+1=2 cycles (independent)

Horizontal transport examples

 

Terminal Tractor single move

che.cycle.move.counter.

1 units / boxes

1 cycle

Image Removed

cycle=1

che.cycle.move.counter.

box=1

Image Added

 

Terminal Tractor double move

2 units / boxes

1 cycles

 

TT che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=2

 TT cycle ends when RTG attach both containers

 

Terminal Tractor double move (2 deliveries in same place)

2 units / boxes

1 cycles

 

Each che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=2

 Each TT cycle ends when RTG attach each  container

 

Terminal Tractor double move (2 deliveries)

2 units / boxes

2 cycles

 

Each che.cycle.move.counter.

cycle=2

che.cycle.move.counter.

box=2

 Each TT cycle ends when each RTG attach the  container

Yard examples

 

Yard single move in

1 units / boxes

1 cycle

Image Removed

che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=1

Image Added

 

Yard double move in

2 units / boxes

1 cycles

 che.cycle.move.counter.

cycle=1

che.cycle.move.counter.

box=2

 

JSON:

XML:

MQTT:

[1]   N. Author1, N. Author 2. Title of the article, Journal of publication, 1, 1-15, 2019

...