CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | on | GRAMMAR |
Concept name | M | On | GRAMMAR |
Concept type | M | Activity | GRAMMAR |
Also known as | O | On; Not Off; Power On; Ready to work; standby; With power; engine on; Power supply on; running; | TIC Description |
Definition | M | If the main power supply and all subject systems are able to operate (do the job it has been designed for) the subject in less than 2 5 seconds requiring no more (a maximum) than one (not a sequence) operator action then TRUE else FALSE | TIC Description |
Further Detail | O | This definition is complementary to the “Off” concept. If the power subject system is able to supply the energy for normal operation and the “control” of the subject is “on” and all the subject systems and subsystems are ready to run the subject for its normal “job” in less than 2 5 seconds (default standby_to_operative_timer = 2Off to On time = 5 seconds) (where the systems requires no more of one operator action intervention to be ready) then it is considered “on”. The operator can do more than one action but the system just requires one. If all of the critical components to operate are “on” then is considered “on”. | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT |
| #CHE; #Gate; #Terminal; #TOS ; #Luminary; #Engine |
|
POINT OF MEASUREMENT |
| #input;#internal_in ; #internal_out ;#output #schedule; #planning; #estimated; #actual; #performed |
|
OBSERVED PROPERTY |
| #status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter; #distance; default standby_to_operative_timer = 2 (defaultofftoontime = 5 (default if not value is consider) |
|
Value |
| TRUE; FALSE; real number; integer |
|
Related standards | O | All related with the safety process to start a Machine. | TIC Description |
Related TIC 4.0 definition | O | #off; #on_standby | TIC Description |
Example | M | che_on_status: TRUE = the Container Handler Equipment is ready to operate or do its job properly in less than 2 5 seconds because the power, the control and all of its systems are able to be ready on time and only needs one operation actions to get it. che_spreader_on_status: TRUE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 5 seconds. che_enginepowersource_on_status: FALSE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 5 seconds. | TIC Description |
Example in the context of the grammar | M | An RTG with the Engine On, electrical drives (inverters) are on and and crane is ready to move with one move of the joystick. che_engine_on_status: TRUE; che_drives_on_status: TRUE; che_control_on_status: TRUE; che_on_status: TRUE An RTG with the Engine On but the electrical drivers (inverters) are off and the control off and both has to be armed by the operator. che_engine_on_status: TRUE; che_drives_on_status: FALSE; che_control_on_status: FALSE; che_on_status: FALSE CHE with the operator seated, engine standby (start-stop system), CHE ready to operate in less than 2 5 seconds just when driver move the joystick then ON che_engine_on_status: FALSE; che_control_on_status: TRUE; che_seat_operator_on_status: TRUE; che_on_status: TRUE; che_on_standby_status: TRUE CHE with the operator not seated, engine standby (start-stop system), CHE ready to operate just when driver seated and move the joystick then OFF che_engine_on_status: FALSE; che_control_on_status: TRUE; che_seat_operator_on_status: FALSE; che_on_status: FALSE; che_on_standby_status: FALSE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
...