CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | off | GRAMMAR |
Concept name | M | Off | GRAMMAR |
Concept type | M | status | GRAMMAR |
|
|
|
|
Also known as | O | Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off; turned off; Out of operations; idle; not running; | TIC Description |
Definition | M | If the main power supply or any system of the subject is not ready to operate (do the job it has been designed for) the subject in less than 2 seconds then TRUE else FALSE | TIC Description |
Further Detail | O | This definition is complementary to “on” concept. If the machine is not able to supply the energy for normal operation or the “control” of the subject is off “off” or any of the subject systems or subsystems are is not ready to run the subject for its normal “job” in less than 2 seconds then it is considered off. If any of the critical components to operate are not “on” then is considered “off”. | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate; #Terminal; #MC; #TOS ; #Luminary | ||
POINT OF MEASUREMENT | #input;#internal_in ; #internal_out ;#output #schedule; #planning; #estimated; #actual; #performed | ||
OBSERVED PROPERTY | #status; #counter; #duration; #timer; #totaltimer #energy; #startevent; #startcounter; #endevent; #endcounter | ||
Value | TRUE; FALSE; integer; real number; | ||
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | #on; #on_standby | TIC Description |
Example | M | che_off_status: TRUE = the Container Handler Equipment is not ready to operate or do its job properly in less than 2 seconds because no power, no control or any of its systems is not able to be ready on time. che_spreader_off_status: FALSE = the Spreader of the Container Handler Equipment is ready to operate properly (lock-unlock-expand-contract) in less than 2 seconds. che_engine_off_status: TRUE = the Engine of the Container Handler Equipment is not ready to generate the power to the CHE working properly in less than 2 seconds. | TIC Description |
Example in the context of the grammar | M | An RTG with the Engine On but the drivers off and the control off che_engine_off_status: FALSE; che_drivers_off_status: TRUE; che_control_off_status: TRUE; che_off_status: TRUE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
M = Mandatory
O = Optional
...
OLD PROPOSAL
CONCEPT
ID | 36 |
Name | CHE Activity Off |
Abbreviation | che.activity.off.command||request||feedback||action.status||counter||timer||energy||distance |
Category | (optional) Tag (Activity, Move, Functional, Operational, OS, etc) groups at a high level the property concept and establish a hierarchy. It is a tag that helps to identify and describe the property. The objective helps the human to classify, find, use the properties. Ie: move; activity; functional, operational, control, TOS. One concept can have several families but must be a closed list. |
Also known as | Engine off; power supply off |
Definition | If main power supply is available to operate in less than 2 seconds then false else true |
Further Detail | If the machine is able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is not main power supply running (ie CHE_Activity_On_Standby : true This definition is complementary to CHE_Activity_On_Standby |
Required | |
Related standards | |
Related TIC 4.0 definition |
HEADER
Info |
---|
Identifies the message in origin, destination, time and unique reference (use this link for more information) |
Mandatory | Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end |
Optional | (Header topic; Header identifier) |
SUBJECT
Info |
---|
Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information) |
Default | Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable) |
Suitable | Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples) |
POINT OF MEASUREMENT
Info |
---|
It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information) |
Default | IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified) |
Optional | Control (from where) |
OBSERVED PROPERTY
Info |
---|
It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information) |
...