CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | off | GRAMMAR |
Concept name | M | Off Status | GRAMMAR |
Concept type | M | #status; #duration; #timer; #power; #energy; | GRAMMAR |
Subject Tag | M | #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL | GRAMMAR |
Also known as | O | Off; Not On; Power Off; Not ready to work; deep standby; No power; Engine off; Power supply off | TIC Description |
Definition | M | If the main power supply is available to operate in less than 2 seconds then false else true | TIC Description |
Further Detail | O | If the machine is not able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is not no main power supply running (ie CHEche_Onon_Standby standby : true) This definition is complementary to CHEche_Onon | TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | #CHE; #STS; #SC; #RTG; #RMG; #TT; #FKL; #Gate | ||
POINT OF MEASUREMENT | affect all the subject so it doesn't make sense to measure in one point. | ||
OBSERVED PROPERTY | #status; #duration; #timer; #power; #energy; | ||
Value | TRUE; FALSE; real number; integrerinteger | ||
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | #On; #On_Standby | TIC Description |
Example | M | che_off_status: TRUE = the Container Handler Equipment is not ready to have the power to work properly in less than 2 seconds. che_spreader_off_status: TRUE = the Spreader of the Container Handler Equipment is not ready to have automatically the power to work properly (lock-unlock-expand-contract) in less than 2 seconds. che_engine_off_status: FALSE the Spreader Engine of the Container Handler Equipment is not ready to have the power to work properly (lock-unlock-expand-contractgive power to the crane) in less than 2 seconds. | TIC Description |
Example in the context of the grammar | M | A RTG with the Engine On but the drivers off and the spreader pump off che_off_status: TRUE; che_spreader_off_status: TRUE; che_engine_off_status: FALSE | TIC Description |
Link to one or more operational processes | M | Any CHE load or discharge operation. | TIC Description |
Search tags | M | #OFF; #Off; #off; #ON; #On; #on; #standby; #running; #working | Technical |
Version / Date | M | TIC_Q4_2020 / 15.09.2020 | Technical |
Internal TIC Version | M | definition technical group | Technical |
M = Mandatory
O = Optional
OLD PROPOSAL
CONCEPT
ID | 36 |
Name | CHE Activity Off |
Abbreviation | che.activity.off.command||request||feedback||action.status||counter||timer||energy||distance |
Category | (optional) Tag (Activity, Move, Functional, Operational, OS, etc) groups at a high level the property concept and establish a hierarchy. It is a tag that helps to identify and describe the property. The objective helps the human to classify, find, use the properties. Ie: move; activity; functional, operational, control, TOS. One concept can have several families but must be a closed list. |
Also known as | Engine off; power supply off |
Definition | If main power supply is available to operate in less than 2 seconds then false else true |
Further Detail | If the machine is able to supply the energy for normal operation in less than 2 seconds then is consider On even if there is not main power supply running (ie CHE_Activity_On_Standby : true This definition is complementary to CHE_Activity_On_Standby |
Required | |
Related standards | |
Related TIC 4.0 definition |
HEADER
Info |
---|
Identifies the message in origin, destination, time and unique reference (use this link for more information) |
Mandatory | Header message timestamp; Header message identifier; Header sender identifier; Header time; Header time start; Header time end |
Optional | (Header topic; Header identifier) |
SUBJECT
Info |
---|
Defines the perimeter and id of the subject (usually defined as a process) (use this link for more information) |
Default | Identifier (Abbreviation, Definition, Long definition); Class (Abbreviation, Definition, Long definition, Suitable) |
Suitable | Name; Number; Family; Subsystem (Abbreviation, Definition, Long definition, Suitable, Examples) |
POINT OF MEASUREMENT
Info |
---|
It defines wherein the process (step, place or time) the observed property of the concept is measured (use this link for more information) |
Default | IN; Request; Feedback; OUT (scheduled; planning; estimated, calculated; actual; verified) |
Optional | Control (from where) |
OBSERVED PROPERTY
Info |
---|
It is the magnitude of the concept (units, volume, weight, energy, time, etc.) (use this link for more information) |
...