CONCEPT
Fields | Type | Description | Purpose |
---|---|---|---|
ID (Concept identifier) | M | wasscheduled | GRAMMAR |
Concept name | M | Was Scheduled | GRAMMAR |
Concept type | M | Status | GRAMMAR |
Also known as | O | action scheduled, timetable, regular program. | TIC Description |
Definition | M | Status indicates that the subject concept was intended to be or do regularly in the far future, for example, a timetable. | TIC Description |
Further Detail | O | This concept can be used for multiple subjects:
| TIC Description |
Required Information | M | TIC Description | |
SUBJECT |
| Terminal, Berth, Yard, Gate, CHE, Actor, |
|
POINT OF MEASUREMENT |
| Scheduled |
|
OBSERVED PROPERTY |
| status; duration; counter; totalcounter; timer; totaltimer |
|
Value |
| status: boolean; duration and timer: seconds, totaltimer: hour. |
|
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | notavailable; available_and_schedulewasschedule; availableavailableand_and_plannedwasplanned; notavailable_and_schedulewasschedule; notavailable_and_plannedwasplanned; | TIC Description |
Example | M |
| TIC Description |
Example in the context of the grammar | M | TIC Description | |
Link to one or more operational processes | M | terminal closed scheduled, terminal closed, holidays, Inspecting Diagnosing Repairing | TIC Description |
Search tags | M | 20241029 | Technical |
Version / Date | M | R0.1 | Technical |
Internal TIC Version | M | schedule | Technical |
...