KPI
Fields | Type | Description | Purpose |
---|---|---|---|
ID (KPIidentifier) | M | craneproductivityproductivity | GRAMMAR |
KPIname | M | Crane Productivity | GRAMMAR |
KPItype | M | OperationalPerformance | GRAMMAR |
Applicable to | CHESTS, MHC, STSRTGs, VESSEL, TERMINALTT, Anything (any subject) that loads/discharge/move cargo | ||
Also known as | O | lifts per hour, performance, (crane) productivity, units per hour, crane throughput | TIC Description |
Definition | M | Average number of boxes per minute move cargo (box) per unit of time (hour) moved by a subject (STS) | TIC Description |
Further Detail | O | By default, the “productivity” refers to the gross performance of a subject to move cargo, with the cargo unit box, the time unit hour and the subject “STS” Average Moves (box per hour) Datapoints (default): chetos|@|cyclejobinstruction|@|order|movedeliver|counter|output|actual|box_or_ tos|@|che|@|onlogged|timer|actual|output|actual|#unit#second#unit#hour|value Operator: SUM(chetos|@|cyclejobinstruction|@|order|movedeliver|counter|output|actual|box) / SUM(tos|@|che|@|onlogged|timer|actual|output|actual|#unit#second#unit#hour|value) Unit: box/hour, TEU/hour, cycle/hour KPI Elements: Timeframe: 2023-01-01T00:00:00.000Z - 2024-01-01T00:00:00.000Z Filter: che|@|nametype: STS01 STS Split: by “labor shift”“shift” Bucket: ie per CHE; hour, per day, per month, per year, per CARRIER #################################################### tos|@|jobinstruction|@|order|deliver|counter|output|actual|box vs che|@|cycle|@|move|counter|output|actual|box tos|@|che|@|logged|timer|actual|output|actual|#unit#hour|value vs che|@|on|timer|actual|output|actual|#unit#hour|value Nowadays productivity normally is measured through the confirmed “deliver” units done by a subject (usually a CHE) through the TOS. The systems are not registring the real moves done only the process wise confirmed moves. For next meeting discussions (Today: April 12nd 2024) Gross crane productivity: Number of boxes (standard box + hatch cover moves) / difference between first and last move Standard move: A standard box movement Hatch cover move: Place hold of the hatch on the vessel. Counts as two moves. Might or might not be invoiceable depending on the terminal Net crane productivity: Number of boxes (standard + hatch cover moves) / (difference between first and last move - billable delays) tos|@|che|@|available|timer|actual|output|actual|#unit#hour|value Billable delay: Any delay considered as invoiceable by the terminal manager caused by:
Non-billable delay:
| TIC Description |
Required Information | M | che|@|cycle|@|move|counter|output|actual|box che|@|on|timer|actual|output|actual|#unit#second#unit#hour|value Timeframe | TIC Description |
SUBJECT | terminal, STS, CHE, Berth, Vessel, CarrierMHC, Anything the loads/discharge conteinerized cargo on a Vessel | ||
CONCEPT | |||
Value | box/hour; TEU/hour | ||
Related standards | O | TIC Description | |
Related TIC 4.0 definition | O | https://tic40.atlassian.net/l/cp/ZpGsxYZa Move Cargo 2021.003 | TIC Description |
Example | M | Average Moves (box per hour) year 2023 bucket per hour, split per cycle and filter by che name STS01 Timeframe: 2023-01-01T00:00:00.000Z - 2024-01-01T00:00:00.000Z Datapoints: che|@|cycle|@|move|counter|output|actual|box = 538 che|@|on|timer|actual|output|actual|#unit#hour|value = 23.0 Operator: SUM(che|@|cycle|@|move|counter|output|actual|box) / SUM(che|@|on|timer|actual|output|actual|#unit#second|value) Filter: che|@|name: STS01 Split: by che|@|cycle Bucket: per day of the week; per hour Gross crane productivity: Number of boxes (standard box + hatch cover moves) / difference between first and last move Standard move: A standard box movement Hatch cover move: Place hold of the hatch on the vessel. Counts as two moves. Might or might not be invoiceable depending on the terminal Net crane productivity: Number of boxes (standard + hatch cover moves) / (difference between first and last move - billable delays) Billable delay: Any delay considered as invoiceable by the terminal manager caused by:
Non-billable delay:
Average Moves (box per hour) = 23.4 | TIC Description |
Example in the context of the grammar | M | See below | TIC Description |
Search tags | M | crane productivity, move/box per hour, GMPH, NMPH, throughput, terminal throughput, TEU throughput, crane productivity | Technical |
Version / Date | M | 2024020220240412 | Technical |
Internal TIC Version | M | R0.1 | Technical |
...