Versiones comparadas

Clave

  • Se ha añadido esta línea.
  • Se ha eliminado esta línea.
  • El formato se ha cambiado.

Within the order of moving a cargo,CONCEPT

Fields

Type

Description

Purpose

ID (Concept identifier)

M

readytodeliver

GRAMMAR

Concept name

M

Ready To Deliver

GRAMMAR

Concept type

M

action

GRAMMAR

Also known as

O

TIC Description

Definition

M

Within the order of moving a cargo, time spent in the destination position of the container, waiting till the container is ready to be dropped.

TIC Description

Further Detail

O

This stage starts when the che arrives at the destination of the container, and ends when the container is drop or unloaded.

  • STS Load:  If the STS do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the container position is locked, or whatever reason, this time will be input here.

  • STS Discharge: If the STS do not stop to release the container this time can be avoided. If need to wait for the Truck to arrive, or cannot enter in the transfer zone or plaform, this time will be input here.

  • TT Load: Time while the truck is waiting in the QC queue or lane, till the container unloaded from the truck.

  • TT Discharge: Time while the truck arrives to the yard position to deliver the container, till the container is unloaded from the platform.

  • RTG: If the RTG do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the truck is not there, the transfer zone is used, or whatever reason, this time will be input here.

  • Strad: If the Strad do not stop to release the container this time can be avoided. If need to wait when arrive to the position because the transfer zone is used, the position is not available, the truck did not arriverd or whatever reason, this time will be input here.

TIC Description

Required Information

M

SUBJECT; OBSERVED PROPERTY and VALUE

TIC Description

SUBJECT

M

order; che,

GRAMMAR

POINT OF MEASUREMENT

O

pom: output

pomt: actual, estimated

GRAMMAR

OBSERVED PROPERTY

M

status, duration, timer, distance

GRAMMAR

Value

M

GRAMMAR

Related standards

O

TIC Description

Related TIC 4.0 definition

O

TIC Description

Example

M

TIC Description

Example in the context of the grammar

M

TIC Description

Link to one or more operational processes

M

TIC Description

Search tags

M

laden at row

Technical

Version / Date

M

2023.007 - 25/03/2023

Technical

Internal TIC Version

M

20230216

Technical

...