Fields | Type | Description | Purpose |
---|
ID (Concept identifier) | M | readytodeliver | GRAMMAR |
Concept name | M | Ready To Deliver | GRAMMAR |
Concept type | M | action | GRAMMAR |
Also known as | O | | TIC Description |
Definition | M | Concept (status) that describes the action that is going to perform by the subject (CHE) to execute an order (action type cargo), at the “laden” end location (end position of the cargo) to drop the cargo. It starts when the subject (CHE) arrives at the end location of the cargo and ends when the cycle ends the laden phase (the cargo is delivered or dropped). Usually, this action is related to the unlocking activities (hoist down and spreader unlocking). | TIC Description |
Further Detail | O | The start of Ready To Deliver is the end of the Moving To Deliver or Queuing To Deliver activities and the end is just when the cargo is unlocked the first time. Specific cases, from the equipment point of view: STS Load: The Ship-to-shore spreader stays (CHE not driving or trolleying) with cargo (locked spreader) at the location where it has to drop the cargo, which usually is the carrier bay and row. Usually, the CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same machine) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject).
STS Discharge: The Ship-to-shore spreader stays (CHE not driving or trolleying) with cargo (locked spreader) at the location where it has to drop the cargo, which is usually the transfer zone. The CHE performs some activities to pick up the cargo (hoist, small trolley and spreader movements). In case there are different subjects (two trolleys or two orders for the same machine) like for multi-trolley operations the pick location could be the pinning/interchange platform and the transfer zone (it depends on the subject). TT/AGV: The Terminal Tractor or AGV platform stays (idle or working) with cargo (slot locked) within the transfer area, after the Moving To Deliver or Queuing To Deliver activities. Usually, the TT needs to do the alignment and the idling to facilitate the operation till the container is placed or lifted from the platform. RTG/RMG/ARMG/ASC: The gantry crane or ASC spreader stays (idle or working) with cargo (locked) within the transfer area or cargo location, after the Moving To Deliver or Queuing To Deliver activities. This area is always over the cargo or carrier slots where the cargo should be dropped (unlocked). SC: The Straddle Carrier spreader stays (idle or working) with cargo (locked) within the cargo location where has to be dropped off (unlocked).
| TIC Description |
Required Information | M | SUBJECT; OBSERVED PROPERTY and VALUE | TIC Description |
SUBJECT | M | order; che, | GRAMMAR |
POINT OF MEASUREMENT | O | pom: output pomt: actual, estimated | GRAMMAR |
OBSERVED PROPERTY | M | status, duration, timer, distance | GRAMMAR |
Value | M | | GRAMMAR |
Related standards | O | | TIC Description |
Related TIC 4.0 definition | O | | TIC Description |
Example | M | | TIC Description |
Example in the context of the grammar | M | | TIC Description |
Link to one or more operational processes | M | | TIC Description |
Search tags | M | laden at row | Technical |
Version / Date | M | 2023.007 - 25/03/2023 | Technical |
Internal TIC Version | M | 20230216 | Technical |